Dale's Daily

Model Train Activities

The following table indicates each section within the Daily pages when I focused on my Model Train layout. The oldest event is at the bottom and the most recent is at the top of the table. One has a choice of whether to link to the page or the specific heading within the page.

Goals

1. Set up Ship It! on a separate PC.

2. Run operational trains on layout.

3. Explore PC software (both MRC and JMRI) for DCC operations.

Table of Specific Activities

Date Time Description
2011.12.24 8:00 am Painted wheel stops, adding ballast to mainline track, running session 2
2011.12.23 5:15 am Notes on early boxcars
2011.12.22 5:10 am Notes on early boxcars
2011.12.21 11:00 am Reading about early rolling stock
2011.12.16 11:30 am Visit Trains & Such in Calgary, buy weathering powders
2011.12.15 8:20 am Weathering rolling stock
2011.12.13 9:00 PM Complete session 2: 7 am - 8 am.
2011.12.12 2:30 PM Buy 2 cars at Model Baron + 16 magazines, begin history timeline
2011.12.11 4:00 PM Complete session 2: 6 am.
2011.12.10 4:00 PM Complete 5 spans for first viaduct kit. Complete session 2: 4 am - 5 am.
2011.12.08 4:00 PM Begin session 2: 4 am.
2011.12.07 7:00 PM Complete session 2: 3 am. Begin building viaduct kits (2)
2011.12.05 8:00 am A few thoughts on next steps
2011.12.04 4:00 PM Begin session 2: 1 am to 2 am. Extend track on two spurs at Wild Rose.
2011.12.02 4:00 PM Update database and Ship It! files to include gondola car, delete 3 old gondola cars
2011.12.01 5:30 PM Bought 1 gondola car at Model Baron + some magazines
     
2011.11.27 2:00 PM Create operating session orders and run trains for period 9:00 PM to 11:59 PM
2011.11.26 9:00 PM Create operating session orders and run trains for period 7:00 PM to 8:00 PM
2011.11.25 4:00 PM Create operating session orders and run trains for period 6:00 PM
2011.11.24 4:00 PM Create operating session orders and run trains for period 3:00 PM to 5:00 PM
2011.11.22 5:00 PM Create operating session orders and run trains for period 1:00 PM to 2:00 PM
2011.11.21 5:00 PM Create operating session orders and run trains for period 8:00 am to 12:00 PM
2011.11.20 7:30 PM Create operating session orders and run trains for 7:00 am
2011.11.19 5:40 am Display operating session orders for 3:00 am; Run all trains for 5:00 am and 6:00 am
2011.11.18 8:00 PM Run all trains for the 4:00 am period
2011.11.16 5:00 PM Run all trains for the period 1:00 am to 3:00 am
2011.11.15 11:30 am Form consist for Train #601 in the Coaldale Yard
2011.11.14 7:15 am Rerun Ship It for a new operating session, place cars in starting location
2011.11.12 11:00 am Continue creating instructions using new system
2011.11.11 3:00 PM Create instructions for 1:00 am to 5:00 am using a new notational system
2011.11.10 4:00 PM Continue playing with format for detailed intstructions
2011.11.09 10:00 PM Renumber switches on layout. Begin detailed instructions using new numbers
2011.11.07 9:00 am Prepared detail instructions for engineers (1:00 am to 9:00 am) & ran trains
2011.11.03 2:00 PM Complete setup for Jan 2, 1950 operations
2011.11.01 2:00 PM Review Ship It settings
     
2011.10.28 3:00 PM Clean track, review Ship It settings
2011.10.14 11:20 am Track cleaner tank car arrived.
     
2011.07.21 2:00 PM Set up Ship It! parameters for better balancing
2011.07.18 1:00 PM Receive MRC wireless computer/Prodigy interface dongle
2011.07.04 10:30 am Session 1: Train #701 from Coaldale to Jasper; Train #400 from Jasper to Coaldale
2011.07.03 11:00 am Session 1: Train #101 from Coaldale to Jasper; Train #100 from Jasper to Coaldale
2011.07.02 8:30 PM Session 1: Train #401 from Prairie Dog to Coaldale; Train #201 heading west from Coaldale to Black Diamond
2011.07.01 10:00 am Session 1: Train #401 heading west from Coaldale to Distillery Row; Train #600 heading east from Jasper (stopped at Prairie Dog)
     
2011.06.30 12:30 PM Session 1: Trains #200 and #700 heading east from Jasper to Coaldale
2011.06.29 12:30 PM Session 1: Train #601 heading west from Coaldale to Jasper
2011.06.28 8:00 am Download MRC-DCC software onto Dell laptop.
2011.06.26 5:15 PM Complete Ship It! parameters. Place rolling stock on layout, form consist for Train #601 in Coaldale Yard.
2011.06.24 3:00 PM Begin using Balancer program to adjust Ship It! parameters
  9:30 PM Data for all 10 trains is complete. The next step is to "balance" the parameters.
2011.06.17 8:00 am Trains added to database, some timetables still need to be created
2011.06.01 7:00 am Industries, consignees and shippers added to database.
     
2011.05.28 9:00 am Databases for rolling stock, locomotives and cabooses now complete.
2011.05.27 5:00 PM Install Ship It! software on Dell Inspiron laptop. Begin creating databases.
2011.05.07 2:00 PM Throttle and base station work fine. Ship It files are missing! Decide to set these files up on a separate PC laptop.
2011.05.05 5:30 PM Receive updated throttle & base station from MRC
     
2011.04.06 5:40 am Update on sending MRC DCC components to MRC