Dale

Introduction

Day Logs

Activities

Current
Future
Past
Cost

Running Sessions

Layout

Track Plan
DCC
Structures
Scenery

Railroad

Locomotives
Rolling Stock
Maintenance

Web Sites

Discussion Board

 

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 85

Previous Page
Next Page

Wednesday December 3, 2008 Lethbridge, Alberta

3:30 PM

It took about 10 minutes to re-program my two stationary decoders that control 8 of my switches to the new numbering system.

I have just completed a full running session based on the Ship It! program. Train 501 left Jasper, heading west with switching stops at Black Diamond, Prairie Dog, and Queenston, before arriving at Coaldale. I am finally getting to the point where I have trains, and the trains move according to some realistic rationale.

I still have some minor operating problems with a few of the rolling stock, but overall it is very exciting to finally be able to say I have an operational DCC layout.

Next Page
Previous Page