Activities
Past

This page contain a brief table of model train activities that I used for about 2 weeks at the end of 2007 and beginning of 2008. It is followed by two tables that I used to keep track of task during 2006 and 2007. I no longer use any of these tables. All of my present and future activities are now found on the two pages devoted to those topics (activitiesPast and activitiesFuture). Links to these pages are located in the left margin of each web page.

Activities Completed (March 01/08 - present) The table format is now identical to the one used in the Activities Current web page. The activities are sorted (most recent at the top) by the date in the green Finish column.

Date
Activities Completed
Start
Finish
 
April
   
       
2008.04.19 Admission to SuperTrain Show in Calgary 2009.04.18 2009.04.19
2008.04.18 Join CN Lines SIG 2009.04.18 2009.04.18
2008.04.18 Purchase 3 TrueLines Gold boxcars 2009.04.18 2009.04.18
2008.04.18 Purchase TSU1000 Light Steam decoder for 0-8-0 steamer 2009.04.02 2009.04.18
2008.09.12 Purchase the latest Canadian Trackside Guide to obtain information on diesel locomotives. (Wait for 2009 issue in March) 2009.04.01 2009.04.01
 
December
   
2008.12.14 Perform maintenance on S-4 diesel locomotive CN 7895 2008.12.14 2008.12.15
2008.11.03 Perform maintenance on CN 539027, CN 210048, MM 0001, MM 0002, MM 0003 2008.12.04 2008.12.08
2008.11.11 Create an accurate Ship It! database for all my 1950's rolling stock 2008.11.11 2008.12.07
2008.12.06 Install Ship It! version 7.0 2008.12.06 2008.12.07
2008.12.02 Install two Loksound decoders into diesel locos 2008.12.02 2008.12.06
2008.12.06 Purchase 2 hopper cars 2008.12.06 2008.12.06
2008.11.26 Purchase more weights for the rolling stock 2008.12.05 2008.12.06
2008.12.05 Purchase Ship It! software 2008.12.05 2008.12.06
2008.12.05 Purchase small station platform kit 2008.12.05 2008.12.05
2008.12.05 Purchase Walther's HO catalogue 2008.12.05 2008.12.05
2008.12.05 Purchase flextrack for holding modern rolling stock 2008.12.05 2008.12.05
2008.09.24 Read "The People's Railway" by Donald MacKay (1992) 2008.09.24 2008.12.04
2008.11.11 Learn to use the Ship It! programs while under free trial 2008.11.11 2008.12.04
2008.11.13 Purchase two Loksound decoders from Tony's Train Exchange 2008.11.13 2008.12.02
 
November
   
2008.11.30 Create schematic diagram of track layout with switch ID#s 2008.11.30 2008.11.30
2008.11.30 Create revised diagram of track layout with switch ID#s 2008.11.30 2008.11.30
2008.09.21 Purchase book on building steam engines in Kingston. It is called "Constructed in Kingston" 2008.09.22 2008.11.27
2008.09.01 Clean all mainline track. 2008.11.20 2008.11.25
2008.01.08 I need to learn about timetables and waybills and operational running procedures. 2008.01.18 2008.11.25
2008.11.25 Check wiring for reversing loop in Jasper 2008.11.25 2008.11.25
2008.09.22 Purchase a small steam locomotive. 2008.11.18 2008.11.18
2008.11.12 Find a way to print Ship It! reports 2008.11.12 2008.11.14
2008.01.08 Assemble cylindrical grain car CN 382001. 2008.10.16 2008.11.14
2008.01.08 Assemble cylindrical grain car ALNX 396478- Spruce Grove. 2008.10.16 2008.11.14
2008.10.25 Ask whether Trains & Such still installs decoders in diesels. 2008.11.13 2008.11.13
2008.10.14 Visit stores in Calgary for stands for manual throw turnouts 2008.11.13 2008.11.13
2008.10.23 Purchase a pkg of Proto 2000 36" non-magnetic wheels 2008.11.13 2008.11.13
2008.10.23 Purchase a pkg of Proto 2000 33" non-magnetic wheels 2008.11.13 2008.11.13
2008.11.09 Purchase screws for mounting Kadee #5 couplers 2008.11.13 2008.11.13
2008.09.03 Purchase one Intermountain 40' CN Boxcar 2008.11.13 2008.11.13
2008.10.23 Purchase 2 pr Proto 2000 Barber S-2 100 Ton Trucks with 36" wheels 2008.11.13 2008.11.13
2008.11.11 Download 30-day free trial of all four Ship It! programs 2008.11.11 2008.11.11
2008.10.25 Download all 4 manuals for the Ship It! programs. Read them. 2008.10.25 2008.11.11
2008.11.11 Run a small train according to a switching list. 2008.11.11 2008.11.11
2008.11.11 Prepare a small switching list for a train between Coaldale and Jasper. 2008.11.11 2008.11.11
2008.09.11 Run a small train over all of the mainline turnouts in the Jasper District. 2008.09.15 2008.11.11
2008.01.08 Assemble cylindrical grain car CN 377990. 2008.10.16 2008.11.09
2008.01.08 Assemble cylindrical grain car ALPX 628114 - Lethbridge. 2008.10.16 2008.11.09
 
October
   
2008.01.08 Assemble Proto 2000 Series 52' 6" Drop End Mill Gondola. 2008.10.05 2008.10.14
2008.10.03 Join Southern Alberta Model Railway Club. 2008.10.07 2008.10.07
 
September
   
2008.09.24 CN 55877 Rotary Snow Plow had the coupler re-attached. The rubber bands were rewound onto the axles so the blade would go round when the wheels moved. The snow deflector was re-attached. 2008.09.24 2008.09.24
2008.09.24 CN 382682 cylindrical hopper, grey with red noodle. Replaced trucks at both ends with Thichy Group delrin trucks and replaced wheels with Kadee 520 non-magnetic 33" freight car wheels. Now operational. 2008.09.24 2008.09.24
2008.09.24 Replace Kadee coupler on one end of CN 473966, a 40' box car having a "green horizontal leaf" with the text "Serves All Canada". The prototype was built in 2 - 46. 2008.09.24 2008.09.24
2008.09.24 Insert photos in top left corner that are appropriate for each section. 2008.09.24 2008.09.24
2008.09.20 Read carefully, and make notes, for "How to Operate Your Model Railroad" by Bruce Chubb. 2008.09.20 2008.09.24
2008.09.23 Complete web site sections for Layout and Railroad 2008.09.23 2008.09.23
2008.09.22 Perform preventative maintenance on passenger observation car Alexandria Bay 2008.09.22 2008.09.22
2008.09.22 Perform preventative maintenance on passenger Pullman coach Riverdale Park 2008.09.22 2008.09.22
2008.09.22 Perform preventative maintenance on passenger coach Lac Flamand 2008.09.22 2008.09.22
2008.09.22 Perform preventative maintenance on passenger baggage car 2351 2008.09.22 2008.09.22
2008.09.22 Replace coupler on passenger coach 1244. Perform preventative maintenance. 2008.09.22 2008.09.22
2008.09.22 Revise Web site section on Running Sessions to include a calendar index for all operational sessions. 2008.09.22 2008.09.22
2008.09.22 Revise Web site section on Running Sessions to include a Bad Order report of any difficulties encountered during the session. 2008.09.22 2008.09.22
2008.09.22 Revise diagram of layout to include deletion of reversing loop around Black Diamond and the addition of a holding track near Queenston. 2008.09.22 2008.09.22
2008.09.21 Test run CN 6700 over the new track sections in Jasper, Black Diamond, and Queenston 2008.09.21 2008.09.21
2008.09.21 Move station and warehouse from Queenston to Jasper 2008.09.21 2008.09.21
2008.09.20 Add a holding spur near the intersection between the mainline and the secondary mainline. 2008.09.21 2008.09.21
2008.09.20 Remove loop around Black Diamond. 2008.09.21
2008.09.21
2008.09.18 Purchase copper tubing for manual throw stands 2008.09.18 2008.09.18
2008.09.01 Purchase latest issue of Canadian Railroad Modeler for article on manual throw stands. 2008.09.01 2008.09.18
2008.09.16 Take photos of all rolling stock for my data base. 2008.09.16 2008.09.16
2008.09.15 Running Session #5 2008.09.15 2008.09.15
2008.09.01 Reattach fallen leaves to trees on layout 2008.09.01 2008.09.15
2008.08.01 Purchase 6 strips of weights for cars. 2008.09.15 2008.09.15
2008.09.09 Review approaches for cleaning track (e.g. BrightBoy, CMX Clean Machine) 2008.09.09 2008.09.15
2008.09.15 Reprogram both Digitrax DS64 stationary decoders to new renumbering system 2008.09.15 2008.09.15
2008.09.15 Renumber turnouts on layout 2008.09.14 2008.09.15
2008.09.11 Update diesel locomotives data base 2008.09.11 2008.09.11
2008.01.08 I need to learn how to program my mainline turnouts using DCC. This involves reading as much as I can about this topic in the two books I have on DCC. I then need to determine what I need to buy (an MRC decoder, plus ?). Finally I need to install this and learn how to operate it using my handheld cab. Once I have one turnout working I can see what is needed to complete this with the remaining mainline turnouts. 2008.09.05 2008.09.09
2008.09.09 Install second Digitrax DS64 decoder to layout 2008.09.09 2008.09.09
2008.09.09 Complete track layout for Lennox. 2008.02.16 2008.09.09
2008.09.01 Trim table top near Jasper 2008.09.01 2008.09.07
2008.09.01 Install a Digitrax DS64 stationary decoder that will handle 4 turnouts. 2008.09.01 2008.09.07
2008.09.05 Drill holes for the 8 turnouts in the Jasper District that will be controlled by the two DS64 modules. 2008.09.05 2008.09.07
2008.09.05 Attach two wires from track connectors to the DS64. 2008.09.05 2008.09.07
2008.09.05 Attach three wires from turnouts 601, 603, 604 & 613 to DS64. 2008.09.05 2008.09.07
2008.09.06 Create a web page to keep track of all my expenses 2008.09.06 2008.09.06
2008.09.05 Purchase small screws for attaching DS64 to underside of table. 2008.09.05 2008.09.05
2008.09.04 Program loco 6700 to Factory Default Settings 2008.09.04 2008.09.05
2008.09.04 Reset all CV values for loco 3 to Factory Default Settings 2008.09.04 2008.09.04
2008.09.04 Read & make notes for MRC Prodigy Wireless User's Manual & QSI Diesel Locomotive Operation Manual 2008.09.04 2008.09.04
2008.09.01 Organize magazines and books on model railroading 2008.09.01 2008.09.02
2008.09.02 Purchase missing copies of volume 15 of Canadian Railway Modeller 2008.09.02 2008.09.02
2008.09.01 Update web site 2008.09.01 2008.09.01
 
March
   
2008.02.15 Purchase 2 Digitrax DS64 decoder turnout modules, each will handle 4 turnouts. 2008.02.15 2008.03.15
2008.01.19 I just found 2 Caboose Industries 204S High Level switch stands in one of my boxes. Now to assemble them and install them on the layout. 2008.02.23 2008.03.10
 
February
   
2008.02.16 Running Session #4 2008.02.16 2008.02.16
2008.02.16 Verify that CN 210048 (reefer), CN 524270 (40' boxcar), CN 123411 (gondola) & CN78213 (caboose) are all operational on all of the mainline track. 2008.02.16 2008.02.22
2008.02.16 Paint water barrels and place on trestle 2008.02.16 2008.02.20
2008.01.26 I have reviewed the gaps in my existing layout. Black Diamond - 2 left manual turnouts, Distillery Row - 2 left manual turnouts, Pine Ridge - 2 right turnouts, Wild Rose - 1 left manual turnout, Coaldale - 1 right manual turnout, Jasper - 1 right manual turnout, 2 left turnouts. That is a total of 7 left manual turnouts and 4 right manual turnouts. I need to purchase them. Then I need to install them. 2008.01.27 2008.02.16
2008.02.16 Purchase a small bottle of "red" color for water barrels on wooden trestle 2008.02.16 2008.02.16
2008.01.20 Purchase an MRC auto reverse module #AD520 for the first reversing loop. 2008.01.31 2008.02.04
2008.01.26 Purchase an MRC auto reverse module #AD520 for the second reversing loop in Jasper. 2008.01.31 2008.02.04
 
January
   
2008.01.31 Paint base of Coaling Tower a sand color. 2008.01.31 2008.01.31
2008.01.30 Purchase a small spray can of red-brown paint for use in Water Tank 2008.01.30 2008.01.31
2008.01.30 Purchase a small bottle of "sand" color for ground at base of Coaling Tower 2008.01.30 2008.01.31
2008.01.29 Cut hole in table for coaling tower. Place tower on layout in Jasper. 2008.01.31 2008.01.31
2008.01.27 Complete track layout, including all turnouts, for Jasper 2008.01.30 2008.01.31
2008.01.30 Purchase 2 right turnouts and 1 left turnout (all electrical) for Jasper 2008.01.30 2008.01.31
2008.01.29 Complete assembly of coaling tower. 2008.01.29 2008.01.29
2008.01.26 Add additional wiring for power to Jasper and Pine Ridge. 2008.01.27 2008.01.27
2008.01.25 Complete track layout, including all turnouts, for mainline near Town1 (Jasper). 2008.01.25 2008.01.27
2008.01.23 Build benchwork for extension to layout. 2008.01.23 2008.01.27
2008.01.26 Purchase pkg of foam roadbed to complete Jasper and Lennox track layout. 2008.01.27 2008.01.27
2008.01.25 Purchase 4 connector tracks. Two will be used to connect a reversing loop module in Town1. The other two will be used to provide power along the new addition to the layout. 3 connectors should be straight track, 1 should be a curved track. 2008.01.27 2008.01.27
2008.01.26 Purchase pkg of foam roadbed to complete mainline track layout. Fasten down mailine track. 2008.01.26 2008.01.26
2008.01.25 Most of the turnouts on the mainline track near the new Town1 (Jasper) are too far away for a hand throw. They will all have to be electonically controlled. 2008.01.25 2008.01.26
2008.01.23 Purchase 4 manual turnouts. I plan to replace 4 electronic turnouts that are on spur lines with these and then use the electronic turnouts on the mainline. 2008.01.23 2008.01.24
2008.01.20 Purchase wood for benchwork for extension to layout. 2008.01.22 2008.01.22
2008.01.19 Running Session #3 2008.01.19 2008.01.19
2008.01.19 I want to develop a plan for an extension of my layout to include a complete loop with a high level bridge. This will include a section that can be easily removed for access to the room when I am not using the layout. 2008.01.19 2008.01.20
2008.01.19 I should complete a Woodland Scenics "Tree Kit" that I bought a couple of years ago. With relatively little effort, this should add a lot of realism to my spartan scenery,The kit contains material for 19 deciduous trees and 8 pine trees. 2008.01.19 2008.01.19
2008.01.19 Running Session #2 2008.01.19 2008.01.19
2008.01.16 Buy yellow paint, paint CN rail stops, install on layout. 2008.01.16 2008.01.19
2008.01.18 The following cars need repairs or maintenance: CN 552942, CN 524270, and CN 539027. 2008.01.18 2008.01.19
2008.01.08 Set up a simple operational run from one point to another. 2008.01.19 2008.01.19
2008.01.18 I need to draw a diagram of my layout and scan it into this web site. 2008.01.18 2008.01.18
2008.01.08 I need to check my FileMaker Pro data base to make sure that it is up to date with locomotives (e.g. CN 6700) as well as other rolling stock. 2008.01.08 2008.01.18
2008.01.16 Purchase a Wellar 25 watt soldering gun & some rosen solder 2008.01.16 2008.01.16
2001.01.09 I need to purchase a #55 drill bit (.052) and some piano wire (.025 - .035) for installing the Caboose Industries switch stands. 2008.01.09 2008.01.10
2008.01.08 I need to install hand throws for all of my non-mainline turnouts. The first step here is to check the Web and perhaps a store or two about what is available. 2008.01.08 2008.01.08
2008.01.08 I need to establish priorities. In doing this I want to find a balance between operations (i.e. running the trains, learning how to set up timetables and waybills), construction of structures and rolling stock, DCC (installing decoders, programming locos, running mainline turnouts), and maintaining this web site. The Train Log web page for January 8 describes the process I used to establish the priorities. 2008.01.08 2008.01.08
2008.01.08 I am unhappy with the overall design of this web site. I need to simplify the left margin Activities structure. 2008.01.08 2008.01.08
2008.01.06 Running Session #1 2008.01.06 2008.01.06

Activities Completed (December 26/07 - February 29/08)

Date Description
2007.12.26
Initial creation of the Dale's Depot web site.
2007.12.26
Copy planning table from old web site to this web site.
2007.12.27
Read "MRC Prodigy Wireless User's Manual" for DCC.
2007.12.27
Read "MRC Prodigy Express" User's Manual" for DCC.
2007.12.27
Wire a Program Track for DCC (this took less than an hour to convert the entire layout from analog to DCC). Amazing.
2007.12.27
Test locomotive CN 6700, a True Line diesel locomotive C-Liner wired for DCC and sound.
2007.12.29
Wire layout for DCC, including the reversing loop.
 
2008.01.07
Clean all mainline track; check for smooth joints and turnouts.
2008.01.07
Run my first train using DCC over the entire mainline.
2008.01.08
Revise structure of Dale's depot web site.
2008.01.09
Do some reading on DCC control of turnouts.
2008.01.10
Buy some short track, foam roadbed, drill bit & piano wire; add track & foam roadbed to layout.
2008.01.15
Buy rail stops, plastic for kitbashing, discuss installation of decoders.
2008.01.16
Buy yellow paint, soldering gun.
2008.01.18
Update FileMaker Pro data base for locomotive CN 6700.
2008.01.18
Draw a diagram of my layout and scan it into this web site.
2008.01.18
Repair 3 box cars (CN 539027, CN 552942, CN 524270).
2008.01.19
Install yellow wheel stops on layout.
2008.01.20
Complete plan for a loop around the walls of the room; include a second reversing loop
2008.01.20
Modify track layout to include a second reversing loop
2008.01.22
Buy lumber for building benchwork for addition to track layout.
2008.01.23
Build benchwork for mainline on west end of room.
2008.01.24
Build benchwork for Town1.
2008.01.25
Add ground cover for new benchwork; lay double mainline track around Black Diamond
2008.01.26
Complete mainline track in Jasper. Determine wiring needs for additions to track layout.
2008.01.27
Complete wiring for layout. Add support for 2 steel bridges. Replace 4 manual turnouts in Pine Ridge, Wild rose and Coaldale. Test run CN 6700 around entire mainline loop (4 times). No problems.
2008.01.29
Complete assembly of coaling tower.
2008.01.30
Finalize track plan for Jasper.
2008.01.31
Complete nailing down track for Jasper. Cut hole for Coal Loading Tower in Jasper.
   
2008.02.01
Install Coal Loading Tower in Jasper.
2008.02.05
Install two MRC Auto Reverse Modules at Pine Ridge and Jasper. This completes the wiring for the track layout. I still need to wire the mainline turnouts.
2008.02.14
Run CN 6700 over various mainline routes, checking for shorts. First run over the wooden trestle.
2008.02.15
Redraw track layout showing location of turnouts. Glue foam base for trestle. Order turnout decoders. Run CN 6700 over various mainline routes.
2008.02.16
Buy 6 manual turnouts and install on layout. Complete track set up. Carry out maintenance on 4 cars (CN 524270, CN 473966, CN 123411, CN 78213).
2008.02.17
Begin diagnostic runs on mainline routes.
2008.02.19
Continue diagnostic runs on mainline routes. Definite problems.
2008.02.21
Continue diagnostic runs on mainline routes. Definite problems.
2008.02.22
Identify problem! I rough rail join was causing a wheel to track through a turnout improperly. Fixed. I then created a consist of CN 6700 & CN 6708 pulling 4 cars (CN 210048 refrigerator, CN 524270 boxcar, CN 123411 gondola, CN 78213 caboose). I ran this train over all the mainline routes at a speed of 40 with no problems. This is the first fully operational run of a train over all of the mainline routes on my layout.
2008.02.23
Assemble Caboose Industries Ground Throw & install on layout. Turnout Identification Number: T451.
   

 

Wednesday December 26, 2007 5:00 PM Lethbridge

The following tables were copied from an earlier web site. All new entries since December 13, 2007 have a green background.

Sunday October 08, 2006 12:00 PM Edmonton

The following tables are intended to provide a way for me to keep track of progress in Learning about model trains.

Date Added Model Trains (Version 2) Totally Revise Layout to Avoid Duck-Unders
2006.10.08 Description
Start
End
Done
2006.10.08 Redesign Layout      
2006.10.08
Decide to totally revise layout to avoid duck-unders
2006.09.21
2006.09.21
Yes
2006.10.08
Prepare rough sketch of new layout
2006.09.21
2006.09.21
Yes
2006.10.08
Create checklist of criteria for new layout
2006.09.22
2006.09.22
Yes
2006.10.08
Draw diagram of layout using EazyDraw software
2006.09.22
2006.09.22
Yes
2006.10.08
Remove all structures and track from version 1 of layout
2006.09.23
2006.09.26
Yes
2006.10.08
Build and install new tables for version 2 of layout
2006.09.24
2006.09.26
Yes
2006.10.08
Place ground cover on tables
2006.10.02
2006.10.02
Yes
2006.10.08
Read about classification yard track layout
2006.10.02
2006.10.02
Yes
2006.10.08
Place track for classification yard in Coaldale
2006.10.02
2006.10.02
Yes
2006.10.08
Place track for Black Diamond coal mine
2006.10.02
2006.10.02
Yes
2006.10.08
Place track for Queenston switching yard
2006.10.03
2006.10.03
Yes
2006.10.08
Place track for Pine Ridge lumber yard and The Channon
2006.10.03
2006.10.03
Yes
2006.10.21
Revise track layout for Black Diamond to make better use of a receiving track
2006.10.19
2006.10.19
Yes
2006.10.21
Revise track layout for The Channon to add an above ground coal yard
2006.10.20
2006.10.10
Yes
 
 
 
2006.10.08 Learn About DCC      
2006.10.08
Visit Trains & Such in Calgary
2006.06.12
2006.06.12
Yes
2006.10.08
Visit local model train club
2006.07.04
2006.07.04
Yes
2006.10.08
Visit Roundhouse shop in Edmonton
2006.07.21
2006.07.21
Yes
2006.10.08
Join local model train club
     
2006.10.08
Read "DCC Made Easy" by Lionel Strang
2006.06.12
2006.06.13
Yes
2006.10.21
Google the Web for DCC sites
2006.10.20
2006.10.20
Yes
2006.10.21
Visit local train show by the Southern Alberta Model Train Club
2006.10.21
2006.10.21
Yes
2006.12.30
Purchase locomotive that is DCC ready & sound
2006.12.30 2006.12.30
Yes
2007.01.01
Purchase DCC system
2007.12.14 2007.12.18
Yes
2007.12.26
Read MRC "Prodigy Wireless User's Manual"
2007.12.26 2007.12.27
Yes
2007.12.26
Read MRC "Prodigy Express User's Manual"
2007.12.26 2007.12.27
Yes
2007.12.27
Set up Program Track for DCC
2007.12.27 2007.12.27
Yes
2007.12.27
Test locomotive CN 6700, a True Line diesel locomotive C-Liner wired for DCC and sound.
2007.12.27 2007.12.27
Yes
2007.12.27
Connect DCC and reversing loop module to layout
2007.12.28 2007.12.29
Yes
2007.12.27
Run CN 6700 over the entire Mainline Track, including the reversing loop
2007.12.28 2008.01.07
Yes
   
2006.10.08 Outer Mainline
2006.10.08
Clarify overall plan
2006.10.03
2006.10.03
Yes
2006.10.08
Test arrival track switching for trains entering the Coaldale classification yard
2006.10.04
2006.10.04
Yes
2006.10.08
Tack down track for Outer Mainline
2006.10.15
2006.10.15
Yes
2006.10.08
Run a test train (5 cars) on the Outer Mainline
2006.10.19
2006.10.19
Yes
2006.10.08
Wire Outer Mainline for Power Districts
2006.10.15
2006.10.08
Tack down Outer Mainline reversing loop
2006.10.15
2006.10.15
Yes
2006.10.21
Add an Atlas Twin controller & wire for the reversing loop
2006.10.20
2006.10.20
Yes
2006.10.21
Run a test train on the Outer Mainline reversing loop
2006.10.20
2006.10.20
Yes
2006.10.08
Build an Outer Mainline control panel
     
2006.10.08
Wire Outer Mainline turnouts to control panel
     
2006.10.21
Add foam bed to Outer Mainline track
2006.10.30 2006.10.30 Yes
2006.10.21
Run a test train on Outer Mainline track
2006.10.30 2006.10.30 Yes
2006.10.21
Attach foam bed & track to tables for Outer Mainline track
2006.10.30 2006.10.30 Yes
2006.10.21
Run a test train on Outer Mainline track
2006.10.30 2006.10.30 Yes
         
2006.10.08 Outer Mainline Switching Areas      
2006.10.21 Coaldale      
2006.10.08
Tentatively lay down Coaldale yard track (including grain terminal)
2006.10.04
2006.10.04
Yes
2006.10.08
Run a test train on the Coaldale yard track
2006.10.04
2006.10.04
Yes
2006.10.21
Add foam bed to Coaldale yard
2007.01.05
2007.01.05
Yes
2006.10.21
Nail foam bed & track to table
2007.01.05
2007.01.05
Yes
2006.10.21

Add uncoupling magnets to Coaldale yard

2006.10.21
Run prototypical train operations in Coaldale yard
   
2006.10.21 Black Diamond
2006.10.08
Tentatively lay down Black Diamond yard track
2006.10.04
2006.10.04
Yes
2006.10.21
Revise Black Diamond yard layout
2006.10.19
2006.10.19
Yes
2006.10.21
Add foam bed and uncoupling magnets to Black Diamond
2006.10.21
2006.10.21
Yes
2006.10.21
Run a test train on the Black Diamond yard track
2006.10.21
2006.10.21
Yes
2006.10.21
Run prototypical train operations in Black Diamond
2006.10.22
2006.10.26
Yes
2006.10.22
Nail foam bed & track to tables
2006.10.26
2006.10.29
Yes
2006.10.22
Run prototypical train operations in Black Diamond
2006.10.29
2006.10.29
Yes
2006.11.03
Spray paint ground cover and building with black paint (aka coal dust)
2006.11.03
2006.11.03
Yes
         
2006.10.21 Distillery Row
2006.10.08
Tentatively lay down Distillery Row yard track
2006.10.04
2006.10.04
Yes
2006.10.21
Add an end-around capability to Distillery Row track
2006.10.20
2006.10.27
Yes
2006.10.21
Add foam bed and uncoupling magnets to Distillery Row
2006.10.30
2006.10.30
Yes
2006.10.21
Run a test train on the Distillery Row yard track
2006.10.30
2006.10.30
Yes
2006.10.21
Nail foam bed & track to tables
2006.10.30
2006.10.30
Yes
2006.10.21
Run prototypical train operations in Distillery Row
2006.10.30
2006.10.30
Yes
   
2006.10.08 Inner Mainline      
2006.10.08
Clarify overall plan
2006.11.01 2006.11.01 Yes
2006.10.08
Wire Inner Mainline for Power Districts
2006.11.03 2006.11.04 Yes
2006.10.08
Nail down track for Inner Mainline loops
2006.11.05 2006.11.05 Yes
2006.10.08
Run a test train on the Inner Mainline loops
     
2006.10.08
Build an Inner mainline control panel
     
2006.10.08
Wire Inner Mainline turnouts to control panel
     
         
2006.10.08 Inner Mainline Switching Areas
2006.10.21 Queenston
2006.10.08
Tentatively lay down Queenston yard track
2006.10.08
2006.10.08
Yes
2006.10.21
Add foam bed to Queenston
2007.01.04
2007.01.04
Yes
2006.10.21
Nail down track for Queenston
2007.01.04
2007.01.04
Yes
2006.10.21
Add uncoupling magnets to Queenston
2006.10.21
Run a test train on the yard track for Queenston
2006.10.21
Run prototypical train operations in Queenston
2006.10.21 Pine Ridge
2006.10.08
Tentatively lay down Pine Ridge track
2006.10.08
2006.10.08
Yes
2006.10.21
Add foam bed at Pine Ridge
2007.01.04
2007.01.04
Yes
2006.10.21
Nail down track for Pine Ridge
2007.01.04
2007.01.04
Yes
2006.10.21
Add uncoupling magnets at Pine Ridge
2006.10.21
Run a test train on at Pine Ridge
2006.10.21
Run prototypical train operations at Pine Ridge
2006.10.21 The Channon
2006.10.08
Tentatively lay down The Channon yard track
2006.10.08
2006.10.08
Yes
2006.10.19
Add elevated track for a coal yard in The Channon
2006.10.19
2006.10.19
Yes
2006.10.21
Add foam bed at The Channon
2007.01.04
2007.01.04
Yes
2006.10.21
Nail down track for The Channon
2007.01.04
2007.01.04
Yes
2006.10.21
Add uncoupling magnets at The Channon
2006.10.21
Run a test train in The Channon
2006.10.21
Run prototypical train operations in The Channon
   
2006.10.08 Assembly of roadside structures
2006.10.08
Complete Oil Tank kit
2006.07.10
2006.07.26
Yes
2006.10.08
Complete Oil Loading Platform #1 kit
2006.07.15
2006.07.18
Yes
2006.10.08
Create oil refinery diorama
2006.07.26
2006.10.08
Complete Oil Loading Platform #2 kit
2006.10.08

Complete wooden trestle kit

2006.07.30
2006.08.13
Yes
2006.10.08
Complete UGG grain elevator
     
2006.10.08
Complete coaling tower
2006.12.06    
2006.10.24
Purchase hay bales. 'nodding head' oil pump
2006.10.24 2006.10.24
Yes
2006.10.25
Paint hay bales & place on layout
2006.11.02 2006.11.10
Yes
2006.10.25
Assemble 'nodding head' oil pump
     
2006.11.05
Complete grain storage bin
     
2006.11.05
Complete water tower
     
         
2006.10.08 Maintenance of Rolling Stock      
2006.10.08
CN 7847 Alco RS-3 diesel locomotive operational
2006.08.11
2006.08.11
Yes
2006.10.08
CN 665489 40' flat car, CN 501417 40' steel box car, G.A.T.X. 22691 36' tank car, CN 78213 steel caboose all operational
2006.08.11
2006.08.11
Yes
2006.10.08
CN 500899 40' wood boxcar, CN 322660 3-bay hopper, BAOX 635 40' single dome tank car all operational
2006.08.12
2006.08.12
Yes
2006.10.15
CN 522360 40' stock car, CN 473966 box car operational
2006.10.15
2006.10.15
Yes
2006.10.16
Update Filemaker Pro data base for model train maintenance
2006.10.16
2006.10.16
Yes
2006.10.21
Assemble CN 5930, an SD40-2 diesel with the NAFTA logo
2006.10.21    
2006.10.21
Assemble six 100 ton quad hopper cars & cover the Union Pacific logo on the sides
2006.10.21 2006.11.15 Yes
2006.10.22
CN 1706 GP7 diesel locomotive operational
2006.10.22 2006.10.22 Yes
2006.10.22
CN 79793 "Old Timer" wooden caboose, CN 74009 Pte St Charles caboose, CN 123411 41' gondola, CN 461010 wooden box car all operational
2006.10.22 2006.10.22 Yes
2006.10.24
Purchase 200 ton crane with CN logo & place on layout
2006.10.24 2006.10.25 Yes
2006.11.01
Dust off, check couplers, and place on layout all remaining rolling stock; update data base
2006.11.01 2006.11.02 Yes
2006.11.02
Dust off and lubricate all diesel locomotives
2006.11.02    
2006.11.04

Lubricate CN 76, clean wheels - operational

2006.11.04 2006.11.04 Yes
2006.11.05

Lubricate CN 1706, clean wheels

     
2006.11.05

Lubricate CN 7847, clean wheels

     
2006.11.05

Lubricate CN 6707, clean wheels

     
2006.11.05

Lubricate CN 6708, clean wheels

     
2006.11.05

Lubricate CN 7985, clean wheels

     
2006.11.05

Lubricate CN 9408, clean wheels

     
2006.11.05

Lubricate CN 2010, clean wheels

     
2006.11.05

Lubricate CN 4346, clean wheels

     
2006.11.05

Lubricate CN 7824, clean wheels

     
2006.11.05

Lubricate CN 6707, clean wheels

     
2006.11.05

Lubricate CN 8502, clean wheels

     
2006.11.05

Lubricate CN 5506, clean wheels

     
2006.11.05

Lubricate CN 9156, clean wheels

     
2006.11.05

Lubricate CN 9162, clean wheels

     
2006.11.02
Dust off and lubricate all steam locomotives
     
2006.12.31

Buy and trim coal loads for 100 ton quad hopper cars

2006.12.31 2007.01.02 Yes
         

 

Model Trains (Version 1)
Description
Start
End
Done
Review present status of layout
Review layout and supplies
2006.05.27
2006.05.27
Yes
Install scenery groundcover
2006.05.30
2006.06.04
Yes
Learn about DCC
Visit Trains & Such in Calgary
2006.06.12
2006.06.12
Yes
Visit local model train club
2006.07.04
2006.07.04
Yes
Visit Roundhouse shop in Edmonton
2006.07.21
2006.07.21
Yes
Join local model train club
     
Read "DCC Made Easy" by Lionel Strang
2006.06.12
2006.06.13
Yes
 
Lower Level Mainline
Clarify overall plan
2006.07.10
2006.07.12
Yes
Tack down track for Lower Mainline loop
2006.07.13
2006.07.13
Yes
Run a test train on the Lower Mainline loop
2006.07.14
2006.07.14
Yes
Wire Lower Mainline for Power Districts
Build a Lower Mainline control panel
Wire Lower Mainline turnouts to control panel
Tack down Lower Mainline reversing loop
Run a test train on the Lower Mainline reversing loop
 
Lower Level Switching Areas
Tack down yard track near oil refinery
Run a test train on the yard track near oil refinery
Tack down yard track for main town
Run a test train on the yard track in the main town
 
Upper Level Mainline
Clarify overall plan
2006.07.19
2006.07.19
Yes
Insert wooden trestle into Upper mainline loop
Tack down track for Upper Mainline loop
Run a test train on the Upper Mainline loop
Wire Upper Mainline for Power Districts
Build an Upper mainline control panel (will need to be revised when Upper Level Extension is added)
Wire Upper Mainline turnouts to control panel (will need to be revised when Upper Level Extension is added)
Tack down Upper Mainline reversing loop
Run a test train on the Upper Mainline reversing loop
 
Upper Level Switching Areas
Tack down yard track near lumber mill
Run a test train on the yard track near lumber mill
Tack down yard track near coal mine
Run a test train on the yard track near coal mine
 
Assembly of roadside structures
Complete Oil Tank kit
2006.07.15
Complete Oil Loading Platform #1 kit
2006.07.15
2006.07.18
Yes
Create oil refinery diorama
Complete Oil Loading Platform #2 kit

Complete wooden trestle kit

2006.07.19
 
Extension of Upper Mainline
Build table structure for high level bridge
Build table structure for furnace room
Build table structure for second small town
Tack down track for Upper Mainline extension
Run a test train on the Upper Mainline extension
Wire Upper Mainline for Power Districts
Build an Upper mainline revised control panel
Wire Upper Mainline turnouts to revised control panel