Dale

Introduction

Day Logs

Activities

Current
Future
Past
Cost

Running Sessions

Layout

Track Plan
DCC
Structures
Scenery

Railroad

Locomotives
Rolling Stock
Maintenance

Web Sites

Discussion Board

 

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 58

Previous Page
Next Page

Saturday October 25, 2008 Lethbridge, Alberta

12:30 PM

I have spent about 3 hours as I finished step 4 (Brake System) to 3 more cylindrical hopper cars. I think this step will be the slowest and most difficult of the 11 steps.

I then completed applying the hinges as part of step 5 (Hatches and Hinges) for one of the cars. The hinges are also very small, but they are not as delicate as the brake system pieces. I still have to snap the hatches into these hinges.

Here are a couple of photos of the activity:

kit
kit
car with hinges added
hatches attached to hinges
kit
kit
2 hinges for each hatch
hatches attached

Here is a close-up of the hinge and hatch:

kit

4:00 PM

I have completed the hinges and hatches for all 4 kits. I estimate that I have spent about 6 hours on these kits today. I still have 6 steps left for each kit, and a large number of tiny pieces to attach. But the progress is noticeable.

5:30 PM

I have downloaded all 4 manuals for the various Ship It! software programs. So far, I think I understand what is required.

Next Page
Previous Page