Dale

Introduction

Day Logs

Activities

Current
Future
Past
Cost

Running Sessions

Layout

Track Plan
DCC
Structures
Scenery

Railroad

Locomotives
Rolling Stock
Maintenance

Web Sites

Discussion Board

 

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 57

Previous Page
Next Page

Friday October 24, 2008 Lethbridge, Alberta

11:30 am

I have spent about an hour and a half attaching 8 tiny pieces to one cylindrical hopper car. These pieces constitute the brake system for the car. I had to be extremely careful detaching the pieces from the sprue and even more careful placing, and cementing, the pieces on the car body. It is difficult to hold a piece with the tweezers as it easily slips out and then bounces all over the place. I was fortunate to not lose any of the pieces. I think a couple of pieces took me about a dozen, maybe 20 tries before I finally had it positioned properly.

Here are three photos of the activity:

model

 

manual

 

model

The two brown pieces were scraps that I used to prop up the top air hose (piece g8 in the diagram) until the cement dried.

At this rate I will be lucky to get this step completed for 2 kits in one day. It may be very slow, and somewhat tedious, but I actually enjoy the challenge.

Next Page
Previous Page