Dale

Introduction

Day Logs

Activities

Current
Future
Past
Cost

Running Sessions

Layout

Track Plan
DCC
Structures
Scenery

Railroad

Locomotives
Rolling Stock
Maintenance

Web Sites

Discussion Board

 

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 59

Previous Page
Next Page

Sunday October 26, 2008 Lethbridge, Alberta

7:30 am

I have just begun step 6 (Roofwalk and Roofwalk Supports). This is going to take awhile. I have an addendum sheet to the instructions that says that "this is the most time consuming part of the kit".

Here is an early photo of the activity - I have installed 3 of the roofwalk supports (there are 36 in total):

kit

10:00 am

I have attached all of the roofwalk supports for the "Lethbridge" cylindical hopper. However the roofwalk piece seems to be slightly warped and does not lie flat on the supports. I will wait until noon to let the glue set firmly on the supports before attempting to address this problem.

3:00 PM

I have finished step 6 for one kit.

kit
kit
all roofwalk supports in place
close-up
kit
kit
solution to warped roofwalk
roofwalk mounted on top of car

Attaching the roofwalk supports was not that difficult. But coming up with a solution to fasten the roofwalk to the supports took a few tries before I had something that worked.

It looks like I should budget one kit per day for this step. I still have 3 kits to go.

Next Page
Previous Page