Daley Train Log
Page 134
This was a promising beginning.
I have returned from the electrical shop with a half-dozen jumper strips for my connector strip. I have mounted them and reviewed the wiring diagram that came with the turntable I bought in February. I think I understand what is required and look forward to testing this out tomorrow.
The holding track to the turntable is now fastened down and the wires to each section have been attached.
The 2 Magnussen trucks that I began assembling in February are finished and are now on the layout. This turned out to be much easier than I expected.
I have just finished running the Session 2 reports from ShipIt! software and am now ready to begin the operational runs.