Daley Train Log
Page 133
A good beginning to the morning.
I have repaired a switch that I thought was broken and placed it on the layout to provide access to the turntable. The outer mainline track was then nailed down and is now operational again. I have placed appropriate sections of straight track entering the turntable but have not nailed this down. This will be done when I get around to doing the wiring. Foam roadbed has been cut to size.
I have begun work on one of the Magnuson HI grain trucks. The first step is to glue the undercarriage to the truck box. Done.