Dale

Introduction

Day Logs

Activities

Current
Future
Past
Cost

Running Sessions

Layout

Track Plan
DCC
Structures
Scenery

Railroad

Locomotives
Rolling Stock
Maintenance

Web Sites

Discussion Board

 

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 26

Previous Page
Next Page

Tuesday February 5, 2008 3:10 PM Lethbridge, Alberta

The two MRC auto reverse loop modules #AD520 arrived in the mail yesterday. I have just finished attaching both of them to the layout. There is no obvious short in the overall track wiring as the green pilot still goes on when the power is turned on. I have yet to run a locomotive over all both of the reversing loops. But this is a promising beginning. In principle the entire layout is now powered and a train can go from any location to any other location.

I cut a hole in the table top at Jasper on February 1 and the Coal Loading Tower was installed on February 2. It looks like a nice addition to the layout.

coal

 

Next Page
Previous Page