Dale

Introduction

Day Logs

Model Railway

a. Layout

Building
Design
DCC

b. Locomotives

c. Cars

d. Operating

e. Summaries

Current
Future
Past
Cost

CNR History

Railfan

Photos

Websites

References

 

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 75

Previous Page
Next Page

Thursday February 4, 2010 Lethbridge, Alberta

7:30 PM

I began work on the GTW caboose that I purchased a few months ago. I have already contacted Walthers about a missing grab iron and they emailed me back saying that they had just shipped me the part.

Although all that is required is the mounting of about 2 dozen grab irons, it is a very finicky operation. I need to drill holes for the ends of the grab irons using a #80 drill which is much finer than a paper clip.

It took me about an hour to mount the grab irons for one end of the caboose. But I actually enjoy this type of work.

The sequence of steps will be to:

This means that I need to buy a small jar of orange paint.

Next Page
Previous Page