Dale

Introduction

Day Logs

Model Railway

a. Layout

Building
Design
DCC

b. Locomotives

c. Cars

d. Operating

e. Summaries

Current
Future
Past
Cost

CNR History

Railfan

Photos

Websites

References

 

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 67

Previous Page
Next Page

Saturday December 26, 2009 Lethbridge, Alberta

12:30 PM

I drove to Model Baron this morning and bought another jar of Medium Grey paint. While in the store I also bought an October 2008 issue of Branchline magazine.

After returning home I put a second coat of paint on the Duck-Under assembly. That should finish the construction. I still need to lightly glue the bridge to the abuttments and then add the track so it is one piece ready for placement.

Next Page
Previous Page