Dale

Introduction

Day Logs

Model Railway

a. Layout

Building
Design
DCC

b. Locomotives

c. Cars

d. Operating

e. Summaries

Current
Future
Past
Cost

CNR History

Railfan

Photos

Websites

References

 

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 64

Previous Page
Next Page

Wednesday December 23, 2009 Lethbridge, Alberta

11:00 am

I trimmed a few areas of excess glue on the duck-under and then relaid (but did not nail down) the track over the duck-under. I also cut a piece of flat plastic to place over the wooden approaches to the two bridges on the duck-under. I need to glue this down and then paint the abuttments a light grey. But first I need to buy the light grey paint.

3:30 PM

I now have the grey paint. While at Model Baron I also bought a number (5) of back issues of Branchline magazine as well as 2 of the 3 earlier issues of Railfan Canada - a new magazine. I am only missing volume 1, number 2.

 

Next Page
Previous Page