Thursday November 6, 2008 Lethbridge, Alberta

7:30 am

I will begin this morning by attaching the roofwalk to the supports for both ALNX 396478 Spruce Grove and CN 382001. I had some difficulty with this step yesterday and will need to start over this morning. Since this involves letting the glue firmly set it will take much of the day before this activity is completed.

However I should be able to move on and work on step 7 "End & Side Ladders" for the other two cars that already have their roofwalks installed - ALPX 628114 Lethbridge and CN 377990 Environmental Mode.

7:30 PM

A good day. It took all day, but the activity was very intermittent, and I was always waiting for some glueing to firmly set before continueing with each car. Here is a photo that shows the ladders before they are attached.

kit

At the end of the day I had successfully completed both steps 6 and 7 for all 4 kits.

kit

There are 4 steps left for each of the 4 cars, but all of these steps are much easier and shorter than the last two steps.