Dale

Introduction

Day Logs

Activities

Current
Future
Past
Cost

Running Sessions

Layout

Track Plan
DCC
Structures
Scenery

Railroad

Locomotives
Rolling Stock
Maintenance

Web Sites

Discussion Board

 

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 62

Previous Page
Next Page

Tuesday November 4, 2008 Lethbridge, Alberta

4:00 PM

I have just finished attaching and glueing the roofwalk for my second cylindrical hopper, the CN Environmental Mode car. This took about 3 hours of elapsed time as the first time the glue failed to hold it properly and I had to resort to glueing half of the roofwalk and holding it down with wooden blocks until it was thoroughly dry, then glueing the remaining half and holding that down with the wooden blocks.

model
model

It felt good to be getting back into this hobby again.

Next Page
Previous Page