Dale

Introduction

Day Logs

Model Railway

a. Layout

Building
Design
DCC

b. Locomotives

c. Cars

d. Operating

e. Summaries

Current
Future
Past
Cost

CNR History

Railfan

Photos

Websites

References

 

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 116

Previous Page
Next Page

Sunday December 19, 2010 Lethbridge, Alberta

6:50 am

My goal today is to review the settings on the Ship It! software. There are problems with the reports for both the passenger and unit coal trains in terms of indicating when the cars are empty or full.

The first step will be to review the posting to a Ship It! user group on Yahoo! to see if this situation has been discussed by others.

Then I will play with a few settings and see if I can figure this out.

The last step will be to post a note to the Yahoo! user group for Ship It! and see if someone there can give me a few suggestions.

6:50 PM

I have corrected a number of problems and have removed all of the error messages that I was aware of. The siding length report now indicates no problems.

However I still do not have an output from the combination of ShipIt! and Balancer that gives me the desired setup for either my passenger train nor my unit coal train.

Next Page
Previous Page