Dale

Introduction

Day Logs

Model Railway

a. Layout

Building
Design
DCC

b. Locomotives

c. Cars

d. Operating

e. Summaries

Current
Future
Past
Cost

CNR History

Railfan

Photos

Websites

References

 

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 96

Previous Page
Next Page

Monday September 6, 2010 Lethbridge, Alberta

9:20 am

I have finished cleaning the track for the entire layout. Queenston and Wild Rose were done this morning. In working on this I noticed two places where the track connectors were improperly set up. This will only take a few minutes to fix but it is a reminder of the detail underlying the entire hobby. I think that is one of the reasons I like it.

2:00 PM

I have tried running a unit coal train but immediately ran into difficulties. The coal cars, which had never actually been used on the layout, kept derailing. A careful examination of their tracking indicated that the problem was with the cars rather than the track.

I replaced the wheels on one car with Proto2000 36" non-magnetic wheels and that seemed to make a big difference. Unfortunately I only have enough wheels for one more car. Time for a break.

Next Page
Previous Page