Dale

Introduction

Day Logs

Model Railway

a. Layout

Building
Design
DCC

b. Locomotives

c. Cars

d. Operating

e. Summaries

Current
Future
Past
Cost

CNR History

Railfan

Photos

Websites

References

 

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 78

Previous Page
Next Page

Wednesday February 10, 2010 Lethbridge, Alberta

7:50 PM

The missing grab-iron (actually a complete package of grab-irons) arrived on Monday. I am very impressed with the service that Walthers provided.

All of the grab-irons have now been attached to the GTW caboose.

caboose

caboose

The grab-irons still need to be painted the same color as the caboose. That will be my next task.

Next Page
Previous Page