Dale

Introduction

Day Logs

Activities

Current
Future
Past
Cost

Running Sessions

Layout

Track Plan
DCC
Structures
Scenery

Railroad

Locomotives
Rolling Stock
Maintenance

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 23

Previous Page
Next Page

Tuesday June 9, 2009 Lethbridge, Alberta

6:30 am

I am off to complete the wiring for the Jasper Yard. My goal for today is to complete this wiring and then work on the Prairie Rose track. I have made substantial progress during the last week and it is showing results. I now have finished the Coaldale Yard (both track and wiring the switches), which is the largest track system for my model train layout. If I accomplish my goal today I will have also finished the Jasper Yard (both layout and wiring) and Prairie Rose (track - no wiring required). Basically that will leave one DCC stationary decoder for 5 mainline switches plus the Instant Horizons covers for the barriers. There is no rush for either of these latter two activities.

10:00 am

There is a problem with my wiring of the Jasper Yard. I tested (always a good idea) the first switch and there was no response. I then worked my way back and discovered the problem. It is difficult to keep all of the wires straight in my mind. Rather than continue to struggle with this, I need to step back and think about how to best handle this.

11:30 am

I made a trip over town and bought two rolls of wire, one yellow and the other green. I am going to rewire the accessories circuit using these colors so I can see at a glance whether the wiring is for the mainline (red and black) or accessories.

I then made a brief visit to the hobby shop and bought a manual switch and a terminal section of straight track which will be used for my DCC programming track.

Finally, I bought a can of spray adhesive to attach the Instant Horizons sheets to my pine barriers.

1:30 PM

All of the track (programming track, Prairie Rose sidings, switches) is now fastened in place.

Next Page
Previous Page