Wednesday June 10, 2009 Lethbridge, Alberta

7:15 am

I have begun changing the wiring for accessories, using yellow and green wires for this circuit. I still have some work in front of me as I replace much of the wire, but already I have been able to test the revised circuit to the set of switches in the Jasper Yard and it now works fine. Great. That was the important hurdle - making sure that I had the right idea for the circuit. The rest is just the physical detail of cutting and stripping wire and attaching it to the terminal strips and control panel.

12:00 PM

I have completed wiring and installing the control panel for the Jasper Yard. It is a great feeling to have both the Coaldale and Jasper Yards now fully operational.

The next two priorities are to install the Instant Horizons scenery sheets to the wooden barriers and to install one Digitrax DS64 stationery decoder to give DCC access to 6 mainline switches behind Distillery Row.

The Instant Horizons scenery sheets need to be reviewed and a plan for the location of all such sheets drawn up before I begin acting on this. Then once I have fastened the three sheets that I currently possess, I will order the remaining sheets.