Monday June 8, 2009 Lethbridge, Alberta

10:00 am

I have finished mounting the 2 control panels for the Coaldale Yard. All that remains for the part of the layout is to clean the tracks.

The current list of remaining items involves 4 separate activities and a total of 6 tasks.

4:00 PM

I have had a close look at the layout and realize that although I have a "workable" layout, there are still a number of additional activities that need attention before it is truly "operational".

All of the remaining switches in Lone Pine, Queenston, Distillery Row and Prairie Dog are within each reach and could be handled manually. Some of these are mainline switches and probably should be set up with DCC control. Then I think I can program the entire mainline to set all of the switches at one time.

But the only item that is really affecting my operational status is the dirty track in the Coaldale Yard.

8:50 PM

The track has been cleaned in the Coaldale Yard.

I have also mounted and connected the terminal strip that will hold the ground wires from each of the 6 switches in the Jasper Yard. All that is left to do is to connect a 3-strand wire from each switch to the control panel/terminal ground strip.