Layout
Track Plan
DCC
Structures
Scenery
Railroad
Locomotives
Rolling Stock
Maintenance
Daley Train Log
Page 21
The list of 7 items that I made yesterday morning is now only 4 items.
The control panel for the 6 mainline switches in the Coaldale Yard is now completely wired. But it still needs to be permanently attached to the table top.
The instruction sheet for the Instant Horizons sheets suggests removing (if possible!) the backdrops and glueing the sheet to a horizontal surface and then remounting it on the layout. Fortunately my barriers are easily removed so I will try that today. But first I will need to go to a local hardware store and buy some spray adhesive.
Here are the additional activities that come to mind:
Another good day. I focused on electrical matters today. I have completely wired the second control panel for the Coaldale Yard. I have a couple of new ideas for mounting these control panels but this will require buying some angle brackets. I will have to wait until the stores open tomorrow morning.
I have just finished painting the 8 CN wheel stops a bright yellow. A small job, but so much of this hobby is numerous small jobs. It looks pretty good at the moment but I will wait until tomorrow to decide whether I should add a second coat.
Reviewing my two lists of activities above, I see that I need to buy one switch (right turn), some spray adhesive, and 6 angle brackets.