Dale

Introduction

Day Logs

Activities

Current
Future
Past
Cost

Running Sessions

Layout

Track Plan
DCC
Structures
Scenery

Railroad

Locomotives
Rolling Stock
Maintenance

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 34

Previous Page
Next Page

Sunday August 16, 2009 Lethbridge, Alberta

7:30 am

The goal for today is to complete attaching the Instant Horizons scenery sheets to the remaining wooden barrier. This barrier is almost 9 feet long, the longest barrier on the layout, and it will involve three separate pieces of wood. The main wooden piece is 7 feet long, there is an extension piece about 2 feet long, and there is another piece that butts against the 7 foot long section. Thus there are a couple of new features to this that I will have to think through.

I glued the first sheet (Freight Yard #949-711) to the main piece last night. And I have just glued the second sheet (Hotel/Business #949-712) to the main piece.

8:15 PM

I have finished gluing the Instant Horizons sheets to the barriers. However I now realize that I will need one more sheet to finish a small abutment to the last barrier. I originally thought I would be able to piece together a small section but it turned out to be impossible to find a matching piece. I will need to order one more sheet before I am completely finished.

barrier
End of Prairie Dog district

barrier
Queenston Heights backdrop

barrier
Looking straight at End of Prairie Dog district (Queenston on other side)

 

Next Page
Previous Page