Dale

Introduction

Day Logs

Activities

Current
Future
Past
Cost

Running Sessions

Layout

Track Plan
DCC
Structures
Scenery

Railroad

Locomotives
Rolling Stock
Maintenance

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 16

Previous Page
Next Page

Monday May 18, 2009 Lethbridge, Alberta

4:00 PM

I have put in about 3 hours moving track around on the Coaldale Yard. Overall I am pleased with the result. I have lost 3 classification sidings, but the net effect is a much cleaner layout. The previous arrangement was too cluttered. I still have a few short pieces to install but I think that the present system is 95% complete.

I then realized that I could set up a slightly different numbering system that would be easier to remember. The new system uses exactly 12 switches, which works rather nicely with the 6-switch control panels that I recently bought.

The track has not been firmly tacked down yet. I still need a few short pieces in order to have everything meet properly.

trains
trains
Coaldale Yard
New numbering system for switches
trains
trains
Coaldale Yard
Nearby messy table

 

Next Page
Previous Page