|
October Chronology Tables for Daily Learning Journals - 2006
This table contains a link to each Notebook web page created on the specified date.
Date |
Link |
Description |
Time |
October 01/06 | Literature |
Continue reading "The Custodian of Paradise" by Wayne Johnston | 1 hr |
October 02/06 | Lay ground cover and create track layout for mainline, Coaldale and Black Diamond | 5 hr | |
Literature |
Continue reading "The Custodian of Paradise" by Wayne Johnston | 1 hr | |
October 03/06 | Complete preliminary track layout for layout | 4 hr | |
Literature |
Continue reading "The Custodian of Paradise" by Wayne Johnston | 1 hr | |
October 04/06 | Begin wiring outer mainline track | 2 hr | |
Literature |
Continue reading "The Custodian of Paradise" by Wayne Johnston | 1 hr | |
October 05/06 | Literature |
Complete reading "The Custodian of Paradise" by Wayne Johnston | 1 hr |
October 06/06 | Mathematics |
Begin reading "Fearless Symmetry" | 1 hr |
October 07/06 | Make notes for "Fearless Symmetry" chap 1; read chap 2 | 3 hr | |
October 08/06 | Make notes for "Fearless Symmetry" chap 2; read chap 3 | 2 hr | |
October 09/06 | Make notes for "Fearless Symmetry" chap 3; read chap 4 | 2 hr | |
October 11/06 | Review personal maths books | 2 hr | |
Literature |
Begin reading "The Major Plays" by Anton Chekov | 1 hr | |
October 12/06 | Complete notes for "Fearless Symmetry" chap 3; read chap 4 | 1 hr | |
Literature |
Continue reading "The Major Plays" by Anton Chekov | 1 hr | |
October 14/06 | Birds |
Add September & October birds to North American data base | 3 hr |
Technology |
Add keywords to iPhoto records | 1 hr | |
October 15/06 | Thumb tack outer mainline track; add 1 barrier strip connection to outer mainline track wiring; add 2 cars to rolling stock in Coaldale yard | 3 hr | |
Technology |
Add keywords to iPhoto records | 1 hr | |
Literature |
Continue reading "The Major Plays" by Anton Chekov | 1 hr | |
October 16/06 | Update train maintenance data base. Finish laying groundcover. Add 2 barrier strips to wiring. | 3 hr | |
October 18/06 | Read & make notes for "Fearless Symmetry" chap 4 | 3 hr | |
Literature |
Complete reading "The Major Plays" by Anton Chekov | 1 hr | |
October 19/06 | Make notes for "Fearless Symmetry" chap 4 | 1 hr | |
Complete wiring for outer mainline; modify track layout in Black Diamond; modify track layout to include coal yard in The Channon; add 4 cars to rolling stock in Coaldale yard. | 2 hr | ||
Literature |
Begin reading "Standing Stones" by John Metcalf | 1 hr | |
October 20/06 | Add wiring and Atlas twin controller for reversing loop on outer mainline; review web sites on DCC | 5 hr | |
October 21/06 | Add temporary foam roadbed & uncoupling magnets under track at Black Diamond | 4 hr | |
Mathematics |
Read "Fearless Symmetry" chapter 5 | 1 hr | |
October 22/06 | Model Trains | Work on table top; begin assembly of SD40-2 diesel (CN 5930); dust off 1 locomotive and 4 additional cars | 3 hr |
October 23/06 | Make notes for "Fearless Symmetry" chap 5; begin reading "The Equation that Couldn't be Solved" | 2 hr | |
October 24/06 | Model Trains |
Visited shop in Calgary. Bought a nodding head oil pump, some hay bales and a 200 ton crane. | 1 hr |
Birds |
Birdwatching at Frank Lake | 1 hr | |
October 25/06 | Read & make notes for "Fearless Symmetry" chap 6; read chaps. 3 & 4 of "The Equation that Couldn't be Solved". | 5 hr | |
Literature |
Continue reading "Standing Stones" by John Metcalf | 2 hr | |
October 26/06 | Glue ground cover at Black Diamond; add guard rails to CN 5930 | 2 hr | |
Literature |
Complete reading "Standing Stones" by John Metcalf | 1 hr | |
October 27/06 | Model Trains | Begin gluing foam roadbed at Black Diamond; begin nailing track to foam roadbed | 2 hr |
Literature |
Begin reading "The Mystery of the Yellow Room" by Gaston Leroux | 1 hr | |
October 28/06 | Read & make notes for "Fearless Symmetry" chap 7; read chap 5 of "The Equation that Couldn't be Solved". | 2 hr | |
Literature |
Complete reading "The Mystery of the Yellow Room" by Gaston Leroux | 1 hr | |
October 29/06 | Using nails, install roadbed and track at Black Diamond. | 4 hr | |
History |
Begin reading "Marie Antoinette" by Antonio Fraser | 1 hr | |
October 30/06 | Model Trains | Make small change to Inner Mainline layout; nail down roadbed & track for Outer Mainline and Distillery Row | 4 hr |
History |
Continue reading "Marie Antoinette" by Antonio Fraser | 1 hr | |
October 31/06 | Model Trains | Update maintenance data base | 2 hr |
The numbers in each cell in the following table gives the number of hours devoted to that activity for each day. The values are obtained from the preceding table.
October |
Ed |
Psy |
Rsh |
Tek |
Ma |
Sc |
His |
Art |
Phil |
Lit |
Tr |
Go |
Brd |
Dr |
Fd |
01 |
1 |
||||||||||||||
02 |
1 |
5 |
|||||||||||||
03 |
1 |
4 |
|||||||||||||
04 |
1 |
2 |
|||||||||||||
05 |
1 |
||||||||||||||
06 |
1 |
||||||||||||||
07 |
3 |
||||||||||||||
08 |
2 |
||||||||||||||
09 |
2 |
||||||||||||||
10 |
|||||||||||||||
11 |
2 |
1 |
|||||||||||||
12 |
1 |
1 |
|||||||||||||
13 |
|||||||||||||||
14 |
1 |
3 |
|||||||||||||
15 |
1 |
1 |
3 |
||||||||||||
16 |
3 |
||||||||||||||
17 |
|||||||||||||||
18 |
3 |
1 |
|||||||||||||
19 |
1 |
1 |
2 |
||||||||||||
20 |
5 |
||||||||||||||
21 |
1 |
4 |
|||||||||||||
22 |
3 |
||||||||||||||
23 |
2 |
||||||||||||||
24 |
1 |
1 |
|||||||||||||
25 |
5 |
2 |
|||||||||||||
26 |
1 |
2 |
|||||||||||||
27 |
1 |
2 |
|||||||||||||
28 |
2 |
1 |
|||||||||||||
29 |
1 |
4 |
|||||||||||||
30 |
1 |
4 |
|||||||||||||
31 |
2 |
||||||||||||||
Totals |