Thursday July 27, 2006 5:45 am Lethbridge Alberta Sunrise 5:55 Sunset 9:21 Hours of daylight: 15:26 
      
        
           | 
           | 
         
        
          From rear window   | 
          South patio   | 
         
        
          Both images taken at 2 PM   | 
         
       
      A. Morning Musings 
       
        5:45 am  It is + 17 C at the moment, with a forecast high of + 30 C. 
          There is a 30% chance of showers this morning with winds between 20 and 40 km/hr. But at the moment it is calm and there are only a few scattered clouds. I cannot recall a summer where the temperature remained around 30 C for so many days.  
        Household chores remain my top priority, a little to my own surprise. I am eager to finish repairing the cracks in the garage floor. I should be able to accomplish that this morning. Cutting the backing for the book boxes will depend on the weather as I want to move the saw outside to avoid sawdust collecting in the garage. A small job is to paint the outside back light.  
        6:15 am The leaves on the trees are beginning to move and there is a refreshing breeze coming in the windows at the moment. Perhaps the forecast will come true. Reviewing the table entries for Immediate action, I see I have 9 hours worth of activities - likely a bit unrealistic. Four hours are tagged for chores. I hope to accomplish this and then will see about working on the model train layout.  
       
      B. Plan 
      
        
          
            | Immediate | 
              | 
              | 
           
          
            |  Health | 
            Walk & exercise  | 
            1 hr  | 
           
          
            | Chores | 
            Repair cracks in cement floor in garage  | 
            3 hr  | 
           
          
            |   | 
            Build 3 more book boxes: cut backing to size and assemble  | 
            2 hr  | 
           
          
            |   | 
            Paint rear outdoor light black  | 
            1 hr  | 
           
          
            | Model Trains  | 
            Wire lower mainline track for a power block  | 
            1 hr  | 
           
          
            |   | 
            Cut base to size for my refinery diorama  | 
            1 hr  | 
           
          
          
            |   | 
            Assemble wooden trestle kit  | 
            1 hr  | 
           
          
            | Literature | 
            Continue reading "The Chronicles of Thomas Covenant"  | 
            2 hr  | 
           
          
          
          
            | Later | 
              | 
              | 
           
          
          
          
          
          
            | Chores | 
            Repair grouting on a few kitchen tiles  | 
            1 hr  | 
           
          
          
            |   | 
            Stain compost bin  | 
            2 hr  | 
           
          
            |   | 
            Investigate water softeners for home  | 
            2 hr  | 
           
          
          
          
            | Technology | 
            Read manual for cell phone  | 
            1 hr  | 
           
          
          
            |   | 
            add keywords to iPhoto records  | 
              | 
           
          
            |   | 
            Make notes for chap. 4 of "Switching to the Mac"  | 
            2 hr  | 
           
          
            |   | 
            Begin reading  "iPhoto"  | 
            1 hr  | 
           
          
            |   | 
            digital photography - learn about using the various manual settings  | 
              | 
           
          
          
            | Mathematics | 
            Larson "Calculus"  | 
              | 
           
          
            |   | 
            Read "The Computational Beauty of Nature" Chap
              2  | 
            1 hr  | 
           
          
            |   | 
            Gardner "The Colossal Book of Short Puzzles" | 
              | 
           
          
            | History | 
            Continue reading "Citizens" | 
              | 
           
          
            |   | 
            Watson "Ideas"  | 
              | 
           
          
          
            | Model Trains  | 
            Add blue backdrop to layout  | 
            2 hr  | 
           
          
          
            |   | 
            Assemble second oil platform kit  | 
              | 
           
          
          
            |   | 
            Review layout for under the table turnouts  | 
              | 
           
         
       
      C. Actual/Notes 
      
        3:05 PM I began the day by painting the rear outdoor light.  Then we did our coulee walk. I then settled into repairing the cracks in the garage floor. This took a bit longer than I anticipated. First, all the cracks had to been cleaned out and vacuumed. Then I added the cement repair mixture, which I made in small batches. I was finally finished at 2 PM. Another job completed. 
        There is some high cloud today which is keeping the temperature down a little. Yesterday it was 32 C, today it is 27 C. 
        
          
             | 
             | 
           
          
            Before  | 
            After  | 
           
          
             | 
             | 
           
          
            Before  | 
            After  | 
           
         
        That is enough hard work for today. I will try to assemble the book boxes tomorrow morning.  I think I will relax for the rest of the day and perhaps do a little reading.  
       
      D. Reflection  |