The following tables are intended to provide a way for me to keep track of progress in Learning about model trains. 
      
        
          | Date Added  | 
          Model Trains (Version 2) Totally Revise Layout to Avoid Duck-Unders  | 
           | 
           | 
           | 
        
        
          | 2006.10.08 | 
          Description | 
          Start  | 
          End  | 
          Done  | 
        
        
          | 2006.10.08 | 
          Redesign Layout  | 
            | 
            | 
            | 
        
        
          | 2006.10.08 | 
          Decide to totally revise layout to avoid duck-unders   | 
          2006.09.21  | 
          2006.09.21  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Prepare rough sketch of new layout   | 
          2006.09.21  | 
          2006.09.21  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Create checklist of criteria for new layout   | 
          2006.09.22  | 
          2006.09.22  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Draw diagram of layout using EazyDraw software   | 
          2006.09.22  | 
          2006.09.22  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Remove all structures and track from version 1 of layout   | 
          2006.09.23  | 
          2006.09.26  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Build and install new tables for version 2 of layout   | 
          2006.09.24  | 
          2006.09.26  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Place ground cover on tables   | 
          2006.10.02  | 
          2006.10.02  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Read about classification yard track layout   | 
          2006.10.02  | 
          2006.10.02  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Place track for classification yard in Coaldale   | 
          2006.10.02  | 
          2006.10.02  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Place track for Black Diamond coal mine   | 
          2006.10.02  | 
          2006.10.02  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Place track for Queenston switching yard   | 
          2006.10.03  | 
          2006.10.03  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Place track for Pine Ridge lumber yard and The Channon   | 
          2006.10.03  | 
          2006.10.03  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Revise track layout for Black Diamond to make better use of a receiving track   | 
          2006.10.19  | 
          2006.10.19  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Revise track layout for The Channon to add an above ground coal yard   | 
          2006.10.20  | 
          2006.10.10  | 
          Yes  | 
        
        
          |   | 
             | 
           | 
           | 
            | 
        
        
          | 2006.10.08 | 
          Learn About DCC  | 
            | 
            | 
            | 
        
        
          | 2006.10.08 | 
          Visit Trains & Such in Calgary   | 
          2006.06.12  | 
          2006.06.12  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Visit local model train club   | 
          2006.07.04  | 
          2006.07.04  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Visit Roundhouse shop in Edmonton   | 
          2006.07.21  | 
          2006.07.21  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Join local model train club   | 
            | 
            | 
            | 
        
        
          | 2006.10.08 | 
          Read "DCC Made Easy" by Lionel Strang   | 
          2006.06.12  | 
          2006.06.13  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Google the Web for DCC sites   | 
          2006.10.20  | 
          2006.10.20  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Visit local train show by the Southern Alberta Model Train Club   | 
          2006.10.21  | 
          2006.10.21  | 
          Yes  | 
        
        
          |   | 
            | 
           | 
           | 
           | 
        
        
          | 2006.10.08 | 
          Outer Mainline  | 
           | 
           | 
           | 
        
        
          | 2006.10.08 | 
          Clarify overall plan   | 
          2006.10.03  | 
          2006.10.03  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Test arrival track switching for trains entering the Coaldale classification yard   | 
          2006.10.04  | 
          2006.10.04  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Tack down track for Outer Mainline  | 
          2006.10.15  | 
          2006.10.15  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Run a test train (5 cars) on the Outer Mainline  | 
          2006.10.19  | 
          2006.10.19  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Wire Outer Mainline for Power Districts   | 
          2006.10.15  | 
           | 
           | 
        
        
        
        
          | 2006.10.08 | 
          Tack down Outer Mainline reversing loop   | 
          2006.10.15  | 
          2006.10.15  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Add an Atlas Twin controller & wire for the reversing loop   | 
          2006.10.20  | 
          2006.10.20  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Run a test train on the Outer Mainline reversing loop   | 
          2006.10.20  | 
          2006.10.20  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Build an Outer Mainline control panel   | 
            | 
            | 
            | 
        
        
          | 2006.10.08 | 
          Wire Outer Mainline turnouts to control panel   | 
            | 
            | 
            | 
        
        
          | 2006.10.21 | 
          Add foam bed to Outer Mainline track   | 
          2006.10.30 | 
          2006.10.30 | 
          Yes | 
        
        
          | 2006.10.21 | 
          Run a test train on Outer Mainline track   | 
          2006.10.30 | 
          2006.10.30 | 
          Yes | 
        
        
          | 2006.10.21 | 
          Attach foam bed & track to tables for Outer Mainline track   | 
          2006.10.30 | 
          2006.10.30 | 
          Yes | 
        
        
        
          | 2006.10.21 | 
          Run a test train on Outer Mainline track   | 
          2006.10.30 | 
          2006.10.30 | 
          Yes | 
        
        
          | 2006.10.21 | 
          Add ballast to foam bed on Outer Mainline track   | 
            | 
            | 
            | 
        
        
          | 2006.10.21 | 
          Run a test train on Outer Mainline track   | 
            | 
            | 
            | 
        
        
          |   | 
            | 
            | 
            | 
            | 
        
        
          | 2006.10.08 | 
          Outer Mainline Switching Areas  | 
            | 
            | 
            | 
        
        
          | 2006.10.21 | 
          Coaldale | 
            | 
            | 
            | 
        
        
          | 2006.10.08 | 
          Tentatively lay down Coaldale yard track (including grain terminal)   | 
          2006.10.04  | 
          2006.10.04  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Run a test train on the Coaldale yard track  | 
          2006.10.04  | 
          2006.10.04  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Add foam bed and uncoupling magnets to Coaldale yard   | 
           | 
           | 
           | 
        
        
          | 2006.10.21 | 
          Run prototypical train operations in Coaldale yard   | 
           | 
           | 
           | 
        
        
          | 2006.10.21 | 
          Attach foam bed & track to table   | 
            | 
            | 
            | 
        
        
          | 2006.10.21 | 
          Run prototypical train operations in Coaldale yard   | 
            | 
            | 
            | 
        
        
          | 2006.10.21 | 
          Apply ballast to track  | 
            | 
            | 
            | 
        
        
          |   | 
            | 
            | 
            | 
            | 
        
        
          | 2006.10.21 | 
          Black Diamond  | 
            | 
            | 
            | 
        
        
          | 2006.10.08 | 
          Tentatively lay down Black Diamond yard track  | 
          2006.10.04  | 
          2006.10.04  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Revise Black Diamond yard layout   | 
          2006.10.19  | 
          2006.10.19  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Add foam bed and uncoupling magnets to Black Diamond   | 
          2006.10.21  | 
          2006.10.21  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Run a test train on the Black Diamond yard track  | 
          2006.10.21  | 
          2006.10.21  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Run prototypical train operations in Black Diamond   | 
          2006.10.22  | 
          2006.10.26  | 
          Yes  | 
        
        
          | 2006.10.22 | 
          Attach foam bed & track to tables   | 
          2006.10.26  | 
          2006.10.29  | 
          Yes  | 
        
        
          | 2006.10.22 | 
          Run prototypical train operations in Black Diamond  | 
          2006.10.29  | 
          2006.10.29  | 
          Yes  | 
        
        
          | 2006.10.22 | 
          Apply ballast to track   | 
           | 
           | 
           | 
        
        
          | 2006.11.03 | 
          Spray paint ground cover and building with black paint (aka coal dust)   | 
          2006.11.03  | 
          2006.11.03  | 
          Yes  | 
        
        
          |   | 
            | 
            | 
            | 
            | 
        
        
          | 2006.10.21 | 
          Distillery Row  | 
           | 
           | 
           | 
        
        
          | 2006.10.08 | 
          Tentatively lay down Distillery Row yard track  | 
          2006.10.04  | 
          2006.10.04  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Add an end-around capability to Distillery Row track   | 
          2006.10.20  | 
          2006.10.27  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Add foam bed and uncoupling magnets to Distillery Row   | 
          2006.10.30  | 
          2006.10.30  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Run a test train on the Distillery Row yard track  | 
          2006.10.30  | 
          2006.10.30  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Attach foam bed & track to tables   | 
          2006.10.30  | 
          2006.10.30  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Run prototypical train operations in Distillery Row   | 
          2006.10.30  | 
          2006.10.30  | 
          Yes  | 
        
        
          | 2006.10.30 | 
          Apply ballast to track   | 
            | 
            | 
            | 
        
        
          |   | 
            | 
           | 
           | 
           | 
        
        
          | 2006.10.08 | 
          Inner Mainline  | 
            | 
            | 
            | 
        
        
          | 2006.10.08 | 
          Clarify overall plan   | 
          2006.11.01 | 
          2006.11.01 | 
          Yes | 
        
        
          | 2006.10.08 | 
          Wire Inner Mainline for Power Districts   | 
          2006.11.03 | 
          2006.11.04 | 
          Yes | 
        
        
          | 2006.10.08 | 
          Nail down track for Inner Mainline loops  | 
          2006.11.05 | 
          2006.11.05 | 
          Yes | 
        
        
          | 2006.10.08 | 
          Run a test train on the Inner Mainline loops   | 
            | 
            | 
            | 
        
        
        
          | 2006.10.08 | 
          Build an Inner mainline control panel  | 
            | 
            | 
            | 
        
        
          | 2006.10.08 | 
          Wire Inner Mainline turnouts to control panel   | 
            | 
            | 
            | 
        
        
          |   | 
            | 
            | 
            | 
            | 
        
        
          | 2006.10.08 | 
          Inner Mainline Switching Areas  | 
           | 
           | 
           | 
        
        
          | 2006.10.21 | 
          Queenston | 
           | 
           | 
           | 
        
        
          | 2006.10.08 | 
          Tentatively lay down Queenston yard track   | 
          2006.10.08  | 
          2006.10.08  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Add foam bed and uncoupling magnets to Queenston   | 
           | 
           | 
           | 
        
        
          | 2006.10.21 | 
          Run a test train on the yard track for Queenston   | 
           | 
           | 
           | 
        
        
          | 2006.10.21 | 
          Run prototypical train operations in Queenston   | 
           | 
           | 
           | 
        
        
          | 2006.10.21 | 
          Nail down track  for Queenston   | 
           | 
           | 
           | 
        
        
        
          | 2006.10.21 | 
          Add ballast to foam bed for Queenston   | 
           | 
           | 
           | 
        
        
          | 2006.10.21 | 
          Pine Ridge  | 
           | 
           | 
           | 
        
        
          | 2006.10.08 | 
          Tentatively lay down Pine Ridge track   | 
          2006.10.08  | 
          2006.10.08  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Add foam bed and uncoupling magnets at Pine Ridge   | 
           | 
           | 
           | 
        
        
          | 2006.10.21 | 
          Run a test train on at Pine Ridge   | 
           | 
           | 
           | 
        
        
          | 2006.10.21 | 
          Run prototypical train operations at Pine Ridge   | 
           | 
           | 
           | 
        
        
        
          | 2006.10.21 | 
          Nail down track  for Pine Ridge   | 
           | 
           | 
           | 
        
        
          | 2006.10.21 | 
          Add ballast to foam bed for Pine Ridge   | 
           | 
           | 
           | 
        
        
          | 2006.10.21 | 
          The Channon  | 
           | 
           | 
           | 
        
        
          | 2006.10.08 | 
          Tentatively lay down The Channon yard track   | 
          2006.10.08  | 
          2006.10.08  | 
          Yes  | 
        
        
        
          | 2006.10.19 | 
          Add elevated track for a coal yard in The Channon   | 
          2006.10.19  | 
          2006.10.19  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Add foam bed and uncoupling magnets at The Channon   | 
           | 
           | 
           | 
        
        
          | 2006.10.21 | 
          Run a test train in The Channon   | 
           | 
           | 
           | 
        
        
          | 2006.10.21 | 
          Run prototypical train operations in The Channon   | 
           | 
           | 
           | 
        
        
        
          | 2006.10.21 | 
          Nail down track  for The Channon   | 
           | 
           | 
           | 
        
        
          | 2006.10.21 | 
          Add ballast to foam bed for The Channon   | 
           | 
           | 
           | 
        
        
          |   | 
            | 
           | 
           | 
           | 
        
        
          | 2006.10.08 | 
          Assembly of roadside structures  | 
           | 
           | 
           | 
        
        
          | 2006.10.08 | 
          Complete Oil Tank kit   | 
          2006.07.10  | 
          2006.07.26  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Complete Oil Loading Platform #1 kit   | 
          2006.07.15  | 
          2006.07.18  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Create oil refinery diorama   | 
          2006.07.26  | 
           | 
           | 
        
        
          | 2006.10.08 | 
          Complete Oil Loading Platform #2 kit   | 
           | 
           | 
           | 
        
        
          | 2006.10.08 | 
          
              Complete wooden trestle kit  
            | 
          2006.07.30  | 
          2006.08.13  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          Complete UGG grain elevator   | 
            | 
            | 
            | 
        
        
          | 2006.10.08 | 
          Complete coaling tower   | 
            | 
            | 
            | 
        
        
          | 2006.10.24 | 
          Purchase hay bales. 'nodding head' oil pump   | 
          2006.10.24 | 
          2006.10.24 | 
          Yes  | 
        
        
          | 2006.10.25 | 
          Paint hay bales & place on layout   | 
          2006.11.02 | 
            | 
            | 
        
        
          | 2006.10.25 | 
          Assemble 'nodding head' oil pump   | 
            | 
            | 
            | 
        
        
          | 2006.11.05 | 
          Complete grain storage bin   | 
            | 
            | 
            | 
        
        
          | 2006.11.05 | 
          Complete water tower   | 
            | 
            | 
            | 
        
        
          |   | 
            | 
            | 
            | 
            | 
        
        
          | 2006.10.08 | 
          Maintenance of Rolling Stock  | 
            | 
            | 
            | 
        
        
          | 2006.10.08 | 
          CN 7847 Alco RS-3 diesel locomotive operational   | 
          2006.08.11  | 
          2006.08.11  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          CN 665489 40' flat car, CN 501417 40' steel box car, G.A.T.X. 22691 36' tank car, CN 78213 steel caboose all operational   | 
          2006.08.11  | 
          2006.08.11  | 
          Yes  | 
        
        
          | 2006.10.08 | 
          CN 500899 40' wood boxcar, CN 322660 3-bay hopper, BAOX 635 40' single dome tank car all operational   | 
          2006.08.12  | 
          2006.08.12  | 
          Yes  | 
        
        
          | 2006.10.15 | 
          CN 522360 40' stock car, CN 473966 box car operational   | 
          2006.10.15  | 
          2006.10.15  | 
          Yes  | 
        
        
          | 2006.10.16 | 
          Update Filemaker Pro data base for model train maintenance   | 
          2006.10.16  | 
          2006.10.16  | 
          Yes  | 
        
        
          | 2006.10.21 | 
          Assemble CN 5930, an SD40-2 diesel with the NAFTA logo   | 
          2006.10.21 | 
            | 
            | 
        
        
          | 2006.10.21 | 
          Assemble six 100 ton quad hopper cars & cover the Union Pacific logo on the sides   | 
          2006.10.21 | 
            | 
            | 
        
        
          | 2006.10.22 | 
          CN 1706 GP7 diesel locomotive operational   | 
          2006.10.22 | 
          2006.10.22 | 
          Yes | 
        
        
          | 2006.10.22 | 
          CN 79793 "Old Timer" wooden caboose, CN 74009 Pte St Charles caboose, CN 123411 41' gondola, CN 461010 wooden box car all operational   | 
          2006.10.22 | 
          2006.10.22 | 
          Yes | 
        
        
          | 2006.10.24 | 
          Purchase 200 ton crane with CN logo & place on layout   | 
          2006.10.24 | 
          2006.10.25 | 
          Yes | 
        
        
          | 2006.11.01 | 
          Dust off, check couplers, and place on layout all remaining rolling stock; update data base   | 
          2006.11.01 | 
          2006.11.02 | 
          Yes | 
        
        
          | 2006.11.02 | 
          Dust off and lubricate all diesel locomotives   | 
          2006.11.02 | 
            | 
            | 
        
        
          | 2006.11.04 | 
          
            
              Lubricate CN 76, clean wheels - operational  
             
            | 
          2006.11.04 | 
          2006.11.04 | 
          Yes | 
        
        
          | 2006.11.05 | 
          
            
              Lubricate CN 1706, clean wheels  
             
            | 
            | 
            | 
            | 
        
        
          | 2006.11.05 | 
          
            
              Lubricate CN 7847, clean wheels  
             
            | 
            | 
            | 
            | 
        
        
          | 2006.11.05 | 
          
            
              Lubricate CN 6707, clean wheels  
             
            | 
            | 
            | 
            | 
        
        
          | 2006.11.05 | 
          
              
                Lubricate CN 6708, clean wheels  
               
            | 
            | 
            | 
            | 
        
        
          | 2006.11.05 | 
          
              
                Lubricate CN 7985, clean wheels  
               
            | 
            | 
            | 
            | 
        
        
          | 2006.11.05 | 
          
              
                Lubricate CN 9408, clean wheels  
               
            | 
            | 
            | 
            | 
        
        
          | 2006.11.05 | 
          
              
                Lubricate CN 2010, clean wheels  
               
            | 
            | 
            | 
            | 
        
        
          | 2006.11.05 | 
          
              
                Lubricate CN 4346, clean wheels  
               
            | 
            | 
            | 
            | 
        
        
          | 2006.11.05 | 
          
              
                Lubricate CN 7824, clean wheels  
               
            | 
            | 
            | 
            | 
        
        
          | 2006.11.05 | 
          
              
                Lubricate CN 6707, clean wheels  
               
            | 
            | 
            | 
            | 
        
        
          | 2006.11.05 | 
          
              
                Lubricate CN 8502, clean wheels  
               
            | 
            | 
            | 
            | 
        
        
          | 2006.11.05 | 
          
              
                Lubricate CN 5506, clean wheels  
               
            | 
            | 
            | 
            | 
        
        
          | 2006.11.05 | 
          
              
                Lubricate CN 9156, clean wheels  
               
            | 
            | 
            | 
            | 
        
        
          | 2006.11.05 | 
          
              
                Lubricate CN 9162, clean wheels  
               
            | 
            | 
            | 
            | 
        
        
          |   | 
            | 
            | 
            | 
            | 
        
        
          | 2006.11.02 | 
          Dust off and lubricate all steam locomotives   | 
            | 
            | 
            | 
        
        
          |   | 
            | 
            | 
            | 
            | 
        
      
      
        
          | Model Trains (Version 1)  | 
           | 
           | 
           | 
        
        
          | Description | 
          Start  | 
          End  | 
          Done  | 
        
        
          | Review present status of layout  | 
           | 
           | 
           | 
        
        
          Review layout and supplies   | 
          2006.05.27  | 
          2006.05.27  | 
          Yes  | 
        
        
          Install scenery groundcover   | 
          2006.05.30  | 
          2006.06.04  | 
          Yes  | 
        
        
          | Learn about DCC  | 
           | 
           | 
           | 
        
        
          Visit Trains & Such in Calgary   | 
          2006.06.12  | 
          2006.06.12  | 
          Yes  | 
        
        
          Visit local model train club   | 
          2006.07.04  | 
          2006.07.04  | 
          Yes  | 
        
        
          Visit Roundhouse shop in Edmonton   | 
          2006.07.21  | 
          2006.07.21  | 
          Yes  | 
        
        
          Join local model train club   | 
            | 
            | 
            | 
        
        
          Read "DCC Made Easy" by Lionel Strang   | 
          2006.06.12  | 
          2006.06.13  | 
          Yes  | 
        
        
          |   | 
           | 
           | 
           | 
        
        
          | Lower Level Mainline  | 
           | 
           | 
           | 
        
        
          Clarify overall plan   | 
          2006.07.10  | 
          2006.07.12  | 
          Yes  | 
        
        
          Tack down track for Lower Mainline loop   | 
          2006.07.13  | 
          2006.07.13  | 
          Yes  | 
        
        
          Run a test train on the Lower Mainline loop   | 
          2006.07.14  | 
          2006.07.14  | 
          Yes  | 
        
        
          Wire Lower Mainline for Power Districts   | 
           | 
           | 
           | 
        
        
          Build a Lower Mainline control panel   | 
           | 
           | 
           | 
        
        
          Wire Lower Mainline turnouts to control panel   | 
           | 
           | 
           | 
        
        
          Tack down Lower Mainline reversing loop   | 
           | 
           | 
           | 
        
        
          Run a test train on the Lower Mainline reversing loop   | 
           | 
           | 
           | 
        
        
          |   | 
           | 
           | 
           | 
        
        
          | Lower Level Switching Areas  | 
           | 
           | 
           | 
        
        
          Tack down yard track near oil refinery   | 
           | 
           | 
           | 
        
        
          Run a test train on the yard track near oil refinery   | 
           | 
           | 
           | 
        
        
          Tack down yard track for main town   | 
           | 
           | 
           | 
        
        
          Run a test train on the yard track in the main town   | 
           | 
           | 
           | 
        
        
          |   | 
           | 
           | 
           | 
        
        
          | Upper Level Mainline  | 
           | 
           | 
           | 
        
        
          Clarify overall plan   | 
          2006.07.19  | 
          2006.07.19  | 
          Yes  | 
        
        
          Insert wooden trestle into Upper mainline loop   | 
           | 
           | 
           | 
        
        
          Tack down track for Upper Mainline loop   | 
           | 
           | 
           | 
        
        
          Run a test train on the Upper Mainline loop   | 
           | 
           | 
           | 
        
        
          Wire Upper Mainline for Power Districts   | 
           | 
           | 
           | 
        
        
          Build an Upper mainline control panel (will need to be revised when Upper Level Extension is added)   | 
           | 
           | 
           | 
        
        
          Wire Upper Mainline turnouts to control panel (will need to be revised when Upper Level Extension is added)   | 
           | 
           | 
           | 
        
        
          Tack down Upper Mainline reversing loop  | 
           | 
           | 
           | 
        
        
          Run a test train on the Upper Mainline reversing loop  | 
           | 
           | 
           | 
        
        
          |   | 
           | 
           | 
           | 
        
        
          | Upper Level Switching Areas  | 
           | 
           | 
           | 
        
        
          Tack down yard track near lumber mill   | 
           | 
           | 
           | 
        
        
          Run a test train on the yard track near lumber mill   | 
           | 
           | 
           | 
        
        
          Tack down yard track near coal mine   | 
           | 
           | 
           | 
        
        
          Run a test train on the yard track near coal mine   | 
           | 
           | 
           | 
        
        
          |   | 
           | 
           | 
           | 
        
        
          | Assembly of roadside structures  | 
           | 
           | 
           | 
        
        
          Complete Oil Tank kit   | 
          2006.07.15  | 
           | 
           | 
        
        
          Complete Oil Loading Platform #1 kit   | 
          2006.07.15  | 
          2006.07.18  | 
          Yes  | 
        
        
          Create oil refinery diorama   | 
           | 
           | 
           | 
        
        
          Complete Oil Loading Platform #2 kit   | 
           | 
           | 
           | 
        
        
          
              Complete wooden trestle kit  
            | 
          2006.07.19  | 
           | 
           | 
        
        
          |   | 
           | 
           | 
           | 
        
        
          | Extension of Upper Mainline  | 
           | 
           | 
           | 
        
        
          Build table structure for high level bridge   | 
           | 
           | 
           | 
        
        
          Build table structure for furnace room   | 
           | 
           | 
           | 
        
        
          Build table structure for second small town   | 
           | 
           | 
           | 
        
        
          Tack down track for Upper Mainline extension   | 
           | 
           | 
           | 
        
        
          Run a test train on the Upper Mainline extension   | 
           | 
           | 
           | 
        
        
          Wire Upper Mainline for Power Districts   | 
           | 
           | 
           | 
        
        
          Build an Upper mainline revised control panel   | 
           | 
           | 
           | 
        
        
          Wire Upper Mainline turnouts to revised control panel   | 
           | 
           | 
           | 
        
        
          |   | 
            | 
            | 
            |