Dale

Introduction

Day Logs

Activities

Current
Future
Past
Cost

Running Sessions

Layout

Track Plan
DCC
Structures
Scenery

Railroad

Locomotives
Rolling Stock
Maintenance

Web Sites

Discussion Board

 

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Running Session 2010.11.16a
Session 20

2010.11.16 10:20 am

Comment:This is a continuation of my Session 1 activities. Train 601 arrived at Black Diamond, where it setout 1 empty coal car and picked up 3 loaded coal cars. The train then moved to Jasper where it setout 1 boxcar. This completed the operating run for Train 601.


Session 1d:
Train #601 arrives at Black Diamond

Locomotive CN 7846 (Alco RS-3) pulling

  • CCX 0002 (empty)
  • CN 475479 (empty)
  • CN 475822 boxcar (removed from service)
  • CN 485338 boxcar (empty)
  • PNR 1986 boxcar (empty)
  • CN 473966 boxcar (office supplies)
  • CN 74009 caboose.


train
Train 601 on the outer mainline

CN 7846 dropped all cars on the mainline before heading into the Black Diamond Yard where it set out CCX 0002 (empty) and then performed an end-around maneuver to pick up 3 cars loaded with coal.

train
CN 7847 pulling 2 loaded coal cars out of holding track

train
CN 7847 pushing 2 loaded coal cars to waiting train (having completed end-around)


CN 7847 then left Black Diamond for Jasper. After travelling 4 loops on the outer mainline (speed 10), switch #6 near Distillery Row was opened and the train travelled over the wooden trestle and into the Jasper Yard. It dropped off the caboose and then backed into the Yard and set out CN 473966 (loaded with clothing) at the 36th St Warehouse.

train
Train 601 on the outer mainline headed for Jasper

train
Train 601 approaching Jasper Yard

Comment:

I removed CN 475822 (boxcar) from service as it continues to derail. It clearly needs some form of maintenance.

Switch #5 in the Jasper Yard did not respond to its electrical signal. This is likely a loose wire problem.

But in general it was a successful operating run with a nice end-around maneuver in Black Diamond.

The Jasper Yard is now a bit congested. I will see if this interferes with anything before Train 600 is due to leave.

I want to try blocking the cars on the next train that has some switching activity. Thus the first few cars would be setouts at town 1, then cars for town 2, and so on.