Dale

Introduction

Day Logs

Activities

Current
Future
Past
Cost

Running Sessions

Layout

Track Plan
DCC
Structures
Scenery

Railroad

Locomotives
Rolling Stock
Maintenance

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 54

Previous Page
Next Page

Saturday December 12, 2009 Lethbridge, Alberta

8:40 am

I am going to begin today by disconnecting sections of the track until I only have the outer mainline connected and working. Then I am slowly going to add sections, one at a time, to the mainline. I will verify that all possible routes around it are working at each step before adding the next section.

11:00 am

I have found one problem so far: the curved connector track that was used to connect the reversing loop module around the Jasper Yard was not transmitting a current/signal to the loop. I have removed it from the layout. That was causing at least some of the "weird" results that I was having.

 

Next Page
Previous Page