Dale

Introduction

Day Logs

Activities

Current
Future
Past
Cost

Running Sessions

Layout

Track Plan
DCC
Structures
Scenery

Railroad

Locomotives
Rolling Stock
Maintenance

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

Daley Train Log
Page 32

Previous Page
Next Page

Friday August 14, 2009 Lethbridge, Alberta

4:00 PM

It has been raining for much of the day and gave me a good reason for working on my layout. I have been working on glueing the Instant Horizons scenery sheets to the wooden barriers.

I have now completed the Lone Pine barrier which involved 2 sheets on each side of the barrier. The Lone Pine side has Tall Timber (#949-702) and Desert to Mountain Transition (#949-704). The Prairie Dog side has Whistle Stop (#949-710) and Desert to Country Transition (#949-707). This barrier is now complete and has been refastened onto the layout.

LonePine
Lone Pine district

Prairie Dog
Prairie Dog district

I am waiting for the glue to dry on the Black Diamond barrier. This only involved 1 side and 1 sheet (#949-701) Sierra Boomtown.

Black Diamond
Black Diamond district

I have 2 wooden barriers still to work on. The Distillery Row barrier is relatively small and will involve 1 sheet on each side. The Queenston barrier is the largest barrier and will involve 3 sheets on each side. But I am getting the hang of how to do this now and do not anticipate any difficulties.

 

Next Page
Previous Page