activities

Introduction

Day Logs

Model Railway

a. Layout

Building
Design
DCC

b. Locomotives

c. Cars

d. Operating

e. Summaries

Current
Future
Past
Cost

CNR History

Railfan

Photos

Websites

References

 

Valid XHTML 1.0 Transitional

Valid CSS!

Dale's Depot

2009 Summaries
Future

This page was created on January 8, 2008. It contains 5 tables. Each table lists a separate category of activity that I have identified as needing to be completed at some time in the future. Within each table the items are sorted by priority (top priority at the top of each table).

Date
Operations (running the trains)
2008.11.27 Set up Divisions and an interchange yard for Ship It! (The track is already in place.)

 

Date
Construction of Structures and Rolling Stock
2008.01.08 I need to install hand throws for all of my non-mainline turnouts. The next step is to either purchase 10 Caboose Industries 204S High Level switch stands or purchase 10 alder switch bases.
2008.01.08 Assemble oil loading platform.
2008.01.08 Assemble grain storage bin.
2008.01.08 Assemble rocking horse oil pump.
2008.01.08 Assemble caboose.
2008.01.08 Assemble 2 high level bridge structures
2008.01.19 I just found 2 Caboose Industries 204S High Level switch stands in one of my boxes. Now to assemble them and install them on the layout.
2008.01.29 Paint coaling tower ground, add coal to ground, add weathering to tower.
2009.12.15 Build a removable duck-under structure
   

 

Date
DCC
2008.01.08 I need to learn how to program my locomotive using cv's (configuration variables) DCC
   

 

Date
Web Site
2008.01.08 I need to learn how to integrate my Filemaker Pro data base into this web site using XML.
2008.01.08 I need to learn how to use my 3rd PlanIt software to create an accurate map of the layout.
2008.10.07 I want to post the URL for this web site to a couple of the Forums that I watch.

 

Date
Miscellaneous