Model Train Journal Entries |
| Monthly Entries |
|
|
2006 |
# |
Description |
| May 28/06 |
|
Begin review of present layout. |
| |
|
Begin reading about DCC. |
| May 30/06 |
|
Read about wiring for DCC; buy ground cover for layout; modify lower level mainline track. |
| May 31/06 |
|
Modify lower level mainline track; locate computer files; trial run of locomotive successful; repair structures. |
| |
|
|
| June 01/06 |
|
Identify next steps. |
| June 03/06 |
|
Lay down "forest green" ground cover. |
| June 11/06 |
|
Prepare diagrams for upper and lower mainline power districts, continue to read about DCC. |
| June 12/06 |
|
Summary of notes on visit to Trains and Such. |
| June 13/06 |
|
Notes on "DCC Made Easy". |
| |
|
|
| July 04/06 |
|
Notes from meeting at Lethbridge Model Train Club. |
| July 10/06 |
|
Thoughts on the wiring plan for the entire layout. |
| July 12/06 |
|
Use EazyDraw software to draw lower level mainline track layout. |
| July 13/06 |
|
Operationalize Lower Mainline track circuit. |
| July 14/06 |
|
Operate a 5-car train on the Lower Mainline; Begin work on oil refinery piping kit. |
| July 15/06 |
|
Work on oil refinery piping kit, oil tank kit. |
| July 16/06 |
|
Work on oil tank kit, oil loading platform. |
| July 18/06 |
|
Complete oil loading platform. |
| July 19/06 |
|
Revise overall plan to include bridges and a trestle as well as expansion to a new switching area. |
| July 26/06 |
|
Complete painting oil tank. |
| July 30/06 |
|
Plan wiring for Lower Mainline loop; begin assembling wooden trestle bridge |
| |
|
|
| August 03/06 |
|
Begin wiring Lower Mainline loop |
| August 04/06 |
|
Continue wiring Lower Mainline loop |
| August 05/06 |
|
Complete wiring Lower mainline loop; modify oil berms to fit layout; set up track for Reversing Loop |
| August 07/06 |
|
Build Lower Mainline Control Panel; work on wooden trestle kit; thumb tack down Lower Mainline Reversing loop |
| August 08/06 |
|
Complete painting Lower Mainline Control Panel; begin wiring Lower Mainline Reversing loop |
| August 09/06 |
|
Glue berms to oil diorama base; wire Reversing loop; create AdeptTracker project management file |
| August 10/06 |
|
Update AdeptTracker file; lay track for Happy Valley |
| August 11/06 |
|
Rewire lower level using spade connectors; run first operational train to Paradise Valley |
| August 12/06 |
|
Work on wooden trestle bridge |
| August13/06 |
|
Complete wooden trestle bridge; build table structure for trestle bridge on Upper Mainline loop |
| August 15/06 |
|
Lay pipe on oil refinery diorama. |
| |
|
|
| September 21/06 |
|
Review and revise plans for track layout (!) |
| September 22/06 |
|
Complete new design for track layout |
| September 23/06 |
|
Dismantle previous layout & begin work on tables for new layout |
| September 26/06 |
|
Complete construction of tables |
| |
|
|
| October 2/06 |
|
Create preliminary track layout for mainline, Coaldale and Black Diamond |
| October 3/06 |
|
Complete preliminary track layout for entire layout |
| October 4/06 |
|
Begin wiring outer mainline track |
| October 15/06 |
|
Thumb tack outer mainline track; add 1 barrier strip connection to outer mainline track wiring; add 2 cars to rolling stock in Coaldale yard |
| October 16/06 |
|
Update train maintenance data base; complete laying ground cover; add 2 barrier strips to outer mainline wiring |
| October 19/06 |
|
Complete wiring for outer mainline; modify track layout in Black Diamond; modify track layout to include coal yard in The Channon; add 4 cars to rolling stock in Coaldale yard. |
| October 20/06 |
|
Add wiring and Atlas twin controller for reversing loop on outer mainline; review web sites on DCC |
| October 21/06 |
|
Add temporary foam roadbed & uncoupling magnets under track at Black Diamond |
| October 22/06 |
|
Work on table top; begin assembly of SD40-2 diesel (CN 5930); dust off 1 locomotive and 4 additional cars |
| October 26/06 |
|
Glue ground cover at Black Diamond; add guard rails to CN 5930 |
| October 27/06 |
|
Begin gluing foam roadbed at Black Diamond; begin nailing track to foam roadbed |
| October 29/06 |
|
Lay roadbed and nail down track for all of Black Diamond. |
| October 30/06 |
|
Lay roadbed & nail down track for Distillery Row and all of Outer Mainline |
| October 31/06 |
|
Update maintenance data base; nail track for White Plains |
| |
|
|
| November 1/06 |
|
Dust off cars; buy paint for hay bales and 100 ton quad hoppers |
| November 2/06 |
|
Dust off cars; paint hay bales and 100 ton quad hoppers |
| November 3/06 |
|
Paint hay bales and 100 ton quad hoppers; begin wiring Inner Mainline track |
| November 4/06 |
|
Paint six 100 ton quad hoppers, complete wiring Inner Mainline track; mtce on loco CN 76 |
| November 5/06 |
|
Paint six 100 ton quad hoppers, complete nailing down Inner Mainline track |
| November 8/06 |
|
Buy train supplies; set up track in The Channon |
| November 10/06 |
|
Begin assembly of 6 quad hopper cars; begin nailing track for The Channon |
| November 14/06 |
|
Assemble 1 quad hopper car; lubricate one diesel locomotive |
| November 15/06 |
|
Complete assembly of 6 quad hopper cars; look at NMRA Achievement Program |
| November 26/06 |
|
Look at NMRA Achievement Program |
| |
|
|
| December 29/06 |
|
Recent supplies purchased. Order TrueLine C-liner with DCC & sound |
| December 30/06 |
|
Search web. Join The Gauge discussion board. Review material on adding ballast to track. |
| December 31/06 |
|
Review web sites. Maintenance for flat car. Buy coal loads for hopper cars |